Quick answers
What is this project?
Proposed Construction Project of warehouse at Gat No:109-113,152, 153, 155-159, 160/1, 160/2, 161, 162/2, 163, A/P Anjrun, Tal- Khalapur, Dist-Raigad, Maharashtra by M/s. Kasturi Logistics is an approved industrial building project in Anjarun, Khalapur, Raigarh, Maharashtra. The site covers 22 acres.
Who is building it?
The applicant is Kasturi logistics.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jan 2026), as of 27 Nov 2026.
Where is it?
In Anjarun, Khalapur, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹45 crore and a site of 22 acres.
When was it filed?
The application was filed on 23 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jan 2026 |
| Application filed | 23 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kasturi logistics |
| Use | Industrial |
| Land area | 22 acres (8.9 ha) |
| Built-up area | 41,000 m² (4,41,320 sq ft) |
| Project cost | ₹45 crore |
| Village / locality | Anjarun |
| Taluk / tehsil | Khalapur |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07508 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22 acres, this one is larger than 81% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjarun, Khalapur, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — environmental approval granted, 1.5 km away
- Man-Made Fiber Manufacturing Industry and Co-generation Unit by M/s Perfect… — lapsed, 2.2 km away
- Project by M/s. Innovassynth Technologies (India) Limited., Khopoli — initial checks, 3.6 km away
- Proposed new project for manufacturing of Synthetic Organic Chemicals at Gut… — returned to applicant, 3.7 km away
- Proposed new project for manufacturing of Synthetic Organic Chemicals at Gut… — cleared for impact study, 3.7 km away
- Proposed new project for manufacturing of Synthetic Organic Chemicals at at… — cleared for impact study, 3.7 km away
- Proposed Building Construction project on CTS No.2472/A/10, 2472/A/11,… — environmental approval granted, 3.9 km away
- The Diversion of Forest Land of 0.0434 Ha. for Laying of Gas Pipeline From… — more information requested, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.