Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jan 2026 |
| Application filed | 10 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Fineotex Chemical Limited |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹46 crore |
| Village / locality | Jambivali |
| Taluk / tehsil | Ulhasnagar |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07521 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Nov 2025 (this page) | Environmental approval granted | 3.5 acres | ₹46 crore |
| Early planning filed 26 Jun 2025 | Cleared for impact study | 3.5 acres | ₹46 crore |
| Early planning filed 24 Dec 2024 | Cleared for impact study | 3.5 acres | ₹46 crore |
In context
100 applications in Thane since January 2022 are in the same category (Industry): 67 approved, 16 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 3.5 acres, this one is larger than 72% of them.
89 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jambivali, Ulhasnagar, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed new project for manufacturing of synthetic organic chemicals at Plot… — cleared for impact study, 0 m away
- Proposed new project for manufacturing of synthetic organic chemicals at Plot… — cleared for impact study, 0 m away
- New Project for Manufacturing Capacity of 27320 TPA (EC Products: 8120 TPA… — environmental approval granted, 850 m away
- New Project for Manufacturing Capacity of 27320 TPA (EC Products: 8120 TPA… — cleared for impact study, 850 m away
- New Project for Manufacturing Capacity of 14120 TPA (EC Products: 8120 TPA… — cleared for impact study, 850 m away
- Proposed Greenfield Project for manufacturing of Specialty chemicals by… — environmental approval granted, 950 m away
- Proposed Greenfield Project for manufacturing of Specialty chemicals by… — cleared for impact study, 950 m away
- Proposed Residential cum commercial Building on S. NO. 63/1/1 of Village-Pale,… — lapsed, 1.1 km away
All 3 Fineotex Chemical projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.