Quick answers
What is this project?
Application for Renewal of Consent to Operate With Change in Product Mix in Existing Products As Per Eia Notification 23rd November 2016 16th January 2020 and 2nd March 2021 is a proposed project in Dhatav Tarf Astami, Roha, Raigarh, Maharashtra. The site covers 8.6 acres.
Who is building it?
The applicant is Deepak Nitrite LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Dhatav Tarf Astami, Roha, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹156 crore and a site of 8.6 acres.
When was it filed?
The application was filed on 20 Feb 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 20 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Deepak Nitrite LTD |
| Land area | 8.6 acres (3.5 ha) |
| Project cost | ₹156 crore |
| Village / locality | Dhatav Tarf Astami |
| Taluk / tehsil | Roha |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07610 |
In context
78 applications in Raigarh since January 2022 are in the same category (Other): 17 approved, 38 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.6 acres, this one is larger than 59% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhatav Tarf Astami, Roha, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. DEEPAK NITRITE LIMITED — withdrawn, 0 m away
- Industrial project by M/s. DEEPAK NITRITE LIMITED — environmental approval granted, 0 m away
- Application for Consent to Operate With Change in Product Mix in Existing… — initial checks, 150 m away
- Expansion of the Drug Intermediates Unit — returned to applicant, 300 m away
- Expansion of the Drug Intermediates Unit — cleared for impact study, 300 m away
- Expansion of Active Pharmaceutical Ingredient (API) manufacturing unit from… — lapsed, 450 m away
- Proposed Expansion of Production of Synthetic Organic Chemicals from 42,960… — lapsed, 450 m away
- Proposed Expansion of Production of Synthetic Organic Chemicals from 42,960… — lapsed, 450 m away
More from Deepak Nitrite LTD in Raigarh
- Industrial project by M/s. DEEPAK NITRITE LIMITED — withdrawn
- Industrial project by M/s. DEEPAK NITRITE LIMITED — environmental approval granted
7 Deepak Nitrite projects in Raigarh
All 18 Deepak Nitrite projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.