What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Raigarh, Maharashtra

Proposed residential cum commercial building development by M/s. Harlequin Infrastructures Developers at Plot no. 101, Sector 08, Pushpak Nagar, Dapoli, Navi Mumbai, Maharashtra 410206

Proposed residential cum commercial building development by M/s. Harlequin Infrastructures Developers at Plot no. 101, Sector 08, Pushpak Nagar, Dapoli, Navi Mumbai, Maharashtra 410206 is an approved mixed-use project in Dapoli, Panvel, Raigarh, Maharashtra. The site covers 1.1 acres. Its stated project cost is ₹117.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 Mar 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed residential cum commercial building development by M/s. Harlequin Infrastructures Developers at Plot no. 101, Sector 08, Pushpak Nagar, Dapoli, Navi Mumbai, Maharashtra 410206 is an approved mixed-use project in Dapoli, Panvel, Raigarh, Maharashtra. The site covers 1.1 acres.

Who is building it?

The applicant is Harlequin Infrastructures Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 24 Mar 2026), as of 27 Nov 2026.

Where is it?

In Dapoli, Panvel, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹117.6 crore and a site of 1.1 acres.

When was it filed?

The application was filed on 17 Nov 2025.

Project details

StatusEnvironmental approval granted
Status since24 Mar 2026
Application filed17 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHarlequin Infrastructures Developers
UseMixed use
Land area1.1 acres (0.4 ha)
Built-up area26,750 m² (2,87,934 sq ft)
Plot area4,449 m² (47,889 sq ft)
Project cost₹117.6 crore
Village / localityDapoli
Taluk / tehsilPanvel
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-07664

What the filings say

What is planned

Harlequin Infrastructures Developers has proposed a residential cum commercial development on a 4,449.90 square metre plot in Pushpak Nagar, Navi Mumbai. The project report describes a single building with 11 floors and a total built-up area of 26,750.00 square metres. The building is designed with three wings (A, B, and C) and reaches a total height of 38.68 metres.

The floor configuration is planned as follows:

Project Specifications

ItemDetail
Plot Area4,449.90 square metres
Total Built-up Area26,750.00 square metres
Building Height38.68 metres
Total FloorsBasement + Ground + 11 floors
Total Population1,584 persons (estimated)
Open Area1,755.28 square metres
Required 4W Parking159 spaces
Required 2W Parking87 spaces (99 proposed)

Layout and design

The master layout shows the building wings arranged around a central driveway. A 6.0-metre wide internal road system is planned for vehicular circulation, with two entry and exit gates connecting to a 24.0-metre wide proposed road. The ground floor plan includes 26 shops of various sizes, with Shop 06 and Shop 26 being the largest units. A Miyawaki plantation of 30 square metres is planned in the corner of the site.

Water, power and access

The total water requirement during the operation phase is estimated at 170 kilolitres per day (KLD). This includes 106 KLD of fresh water for domestic use, sourced from CIDCO, and 64 KLD of recycled water for flushing (62 KLD) and landscaping (2 KLD). During the construction phase, water will be supplied via tankers and CIDCO.

The maximum power demand is estimated at 1,194 kW, to be supplied by the Maharashtra State Electricity Distribution Company Limited (MSEDCL). For backup, the applicant proposes one 365 kVA diesel generator set to power lifts and common area lighting. Energy conservation measures include the installation of solar photovoltaic panels, which are expected to provide 5% energy savings, and the use of LED fixtures and motion sensors.

Environmental safeguards

The project includes a Sewage Treatment Plant (STP) with a capacity of 170 KLD using Moving Bed Bio Reactor (MBBR) technology. Treated water will be reused for flushing and landscaping, with 51.48 KLD of excess treated water discharged into the municipal sewer line.

For solid waste, the project is expected to generate 631 kg per day, consisting of 252 kg of biodegradable waste and 379 kg of non-biodegradable waste. An on-site Organic Waste Converter (OWC) with a capacity of 300 kg per day is proposed to process wet waste into manure. Rainwater harvesting will be managed through a tank with a total capacity of 84 cubic metres.

Construction materials required for the project include:

Timeline

The applicant estimates a capital cost of ₹303.28 lakhs for environmental management measures during the operation phase, with an annual operation and maintenance cost of ₹26.00 lakhs. The total project cost is stated as ₹117.59 crore.

Harlequin Infrastructures Developers Residential Cum Commercial Building Development site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Harlequin Infrastructures Developers Residential Cum Commercial Building Development: Master layout: ground floor plan showing shops, wings, and internal roads (preview)🔒 Sign in free to see it
Master layout: ground floor plan showing shops, wings, and internal roads
Harlequin Infrastructures Developers Residential Cum Commercial Building Development: Conceptual layout plan with building footprint and open spaces (preview)🔒 Sign in free to see it
Conceptual layout plan with building footprint and open spaces
Harlequin Infrastructures Developers Residential Cum Commercial Building Development: Schematic flow diagram of the proposed Sewage Treatment Plant (preview)🔒 Sign in free to see it
Schematic flow diagram of the proposed Sewage Treatment Plant
Harlequin Infrastructures Developers Residential Cum Commercial Building Development: Rainwater harvesting tank calculation and section detail (preview)🔒 Sign in free to see it
Rainwater harvesting tank calculation and section detail

In context

674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 73% of them.

117 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dapoli, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Harlequin Infrastructures Developers in Raigarh

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.