Quick answers
What is this project?
Slum Rehabilitation Scheme at plot bearing CTS No. 32 (pt.), 33, 35, 37, 37/1 to 85, 38, 39(pt.), 42, 42/1 to 81 Village: Kandivali, Behind Poisar Depot, Taluka: Borivali, District: Mumbai, State: Maharashtra – (400067) India by M/s. RAGHU LEELA REALTORS PVT. LTD is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 4.2 acres.
Who is building it?
The applicant is M/S. Raghu Leela Realtors PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹745 crore and a site of 4.2 acres.
When was it filed?
The application was filed on 6 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2026 |
| Application filed | 6 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | M/S. Raghu Leela Realtors PVT. LTD. |
| Use | Residential |
| Land area | 4.2 acres (1.7 ha) |
| Built-up area | 1,91,703 m² (20,63,472 sq ft) |
| Plot area | 12,600 m² (1,35,625 sq ft) |
| Project cost | ₹745 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07884 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Dec 2025 (this page) | Environmental approval granted | 4.2 acres | ₹745 crore |
| Early planning filed 18 Sept 2025 | Cleared for impact study | 4.2 acres | ₹745 crore |
| Early planning filed 7 Aug 2025 | Cleared for impact study | 4.2 acres | ₹745 crore |
| Early planning filed 14 Apr 2025 | Withdrawn | 4.2 acres | ₹745 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.2 acres, this one is larger than 71% of them.
526 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.8 km away).
Other projects nearby
- Slum Rehabilitation Scheme at plot bearing CTS No. 32 (pt.), 33, 35, 37, 37/1… — cleared for impact study, 0 m away
- Slum Rehabilitation Scheme at plot bearing CTS No. 32 (pt.), 33, 35, 37, 37/1… — cleared for impact study, 0 m away
- Slum Rehabilitation Scheme at plot bearing CTS No. 32 (pt.), 33, 35, 37, 37/1… — withdrawn, 0 m away
- Expansion in Environment Clearance of Proposed Residential Project at C.T.S.… — environmental approval granted, 150 m away
- Expansion in Environment Clearance of Proposed Residential Project at C.T.S.… — environmental approval granted, 150 m away
- Expansion in Environment Clearance for Proposed redevelopment on plot bearing… — environmental approval granted, 300 m away
- Proposed redevelopment on plot bearing C.T.S. No. 89C of Kandivali, village… — environmental approval granted, 300 m away
- Amendment and Expansion in Environmental Clearance for proposed Redevelopment… — environmental approval granted, 400 m away