Quick answers
What is this project?
Proposed Manufacturing of Specialty Chemical Plant at W-19/20 Mahad MIDC, District Raigad, Maharashtra is a proposed industrial project in Khaire Tarf Birwadi, Mahad, Raigarh, Maharashtra. The site covers 8.3 acres.
Who is building it?
The applicant is Oasis Chemical Industries.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Sept 2025), as of 27 Nov 2026.
Where is it?
In Khaire Tarf Birwadi, Mahad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹3 crore and a site of 8.3 acres.
When was it filed?
The application was filed on 13 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Manufacturing of Specialty Chemical Plant at W-19/20 Mahad MIDC, District…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Sept 2025 |
| Application filed | 13 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Oasis Chemical Industries |
| Land area | 8.3 acres (3.4 ha) |
| Project cost | ₹3 crore |
| Village / locality | Khaire Tarf Birwadi |
| Taluk / tehsil | Mahad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08087 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Feb 2026 | Environmental approval granted | 7.7 acres | ₹3 crore |
| Early planning filed 13 May 2025 (this page) | Cleared for impact study | 8.3 acres | ₹3 crore |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.3 acres, this one is larger than 64% of them.
Where it is
Khaire Tarf Birwadi, Mahad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing of Specialty Chemical Plant at W-19/20 Mahad MIDC,… — environmental approval granted, 7.4 km away
- Proposed Manufacturing of Synthetic Resin-Based Products by M/s Westin Coating… — cleared for impact study, 88.6 km away
- New project (Green Field) for manufacturing of Specialty Chemicals & Chemical… — cleared for impact study, 88.8 km away
- Manufacturing of synthetic organic chemical & polymer industry BY KWANTUM… — environmental approval granted, 88.8 km away
- Manufacturing of synthetic organic chemical & polymer industry BY KWANTUM… — cleared for impact study, 88.8 km away
- Industrial project by Dmss Infra (India) Private Limited — lapsed, 88.9 km away
- Project for hydrogenation of synthetic organic chemicals at Plot No. FS-14,… — cleared for impact study, 89 km away
- Application for Amendment in Consent to Operate with change in product mix in… — initial checks, 89.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.