What is Developing? Open the mapMap

LapsedBuildings & townships · Mumbai Suburban, Maharashtra

Building project by M/s. Shreeji Constructions

This lapsed building project by M/s. Shreeji Constructions is in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.4 acres. Its stated project cost is ₹185 crore. As of 27 Nov 2026, its status is “Lapsed” (since 19 Jul 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Building project by M/s. Shreeji Constructions?

This lapsed building project by M/s. Shreeji Constructions is in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.4 acres.

Who is building it?

The applicant is M/S. Shreeji Constructions.

Has it been approved?

No. The application was lapsed on 19 Jul 2025, so it is no longer under consideration.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹185 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 19 Feb 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Building project by M/s. Shreeji Constructions.

Project details

StatusLapsed
Status since19 Jul 2025
Application filed19 Feb 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantM/S. Shreeji Constructions
Land area1.4 acres (0.6 ha)
Project cost₹185 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-08161

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 19 Mar 2025Environmental approval granted1.4 acres₹185 crore
Expansion filed 19 Feb 2025 (this page)Lapsed1.4 acres₹185 crore

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.4 acres, this one is smaller than 60% of them.

559 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.2 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.