Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Nov 2025 |
| Application filed | 21 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Aurum Real Estate Developers Limited |
| Use | Mixed use |
| Land area | 30 acres (12.1 ha) |
| Built-up area | 8,18,774 m² (88,13,201 sq ft) |
| Plot area | 1,21,406 m² (13,06,802 sq ft) |
| Project cost | ₹32.9 crore |
| Village / locality | Ghainsoli Tarf Khairne |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08321 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Apr 2026 | More information requested | 30 acres | ₹32.9 crore |
| Early planning filed 21 Nov 2025 (this page) | Cleared for impact study | 30 acres | ₹32.9 crore |
What the filings say
What is planned
Aurum Real Estate Developers Limited proposes the expansion and upgradation of the Q Parc IT Park (formerly Loma IT Park) at the Trans Thane Creek (TTC) Industrial Area in Ghansoli. The project is an integrated IT park featuring IT offices and residential support services.
The expansion involves modifications to the existing approved layout, including the expansion of IT Building Q3 and the addition of three new residential buildings (R8, R9, and R10A/B) along with a clubhouse. The project also includes the demolition of the existing i-Rise building. The total construction area after expansion will reach 8,18,773.81 sq. m, comprising 4,23,471.25 sq. m of Floor Space Index (FSI) area and 3,95,302.56 sq. m of non-FSI area.
Building Configuration and Occupancy
The total estimated occupancy for the entire campus is 62,186 persons, with 40,064 in the IT buildings and 15,251 in the residential components. The implementation status of the buildings is as follows:
- IT Building Q1: G + 3 Parking + Podium + 13 floors (Completed and occupied).
- IT Building Q2: G + 3 Parking + Podium + 18 floors (Completed and occupied).
- IT Building Q3: 2 Basements + Ground + 5 Parking + Podium + 23 floors (Under construction; proposed for expansion).
- Residential Buildings R1, R2, R2A: G + 3 Parking + Podium + 30 floors (Completed and occupied).
- Residential Buildings R4, R5: 1 Basement + G + 2 Parking + Podium + 37 floors (Completed and occupied).
- Residential Buildings R6, R7: 1 Basement + G + 2 Parking + Podium + 37 floors (Under construction).
- Residential Buildings R8, R9, R10A/B: 1 Basement + G + 4 Parking + Landscape Podium + 40 floors + 1 recreational floor (Proposed new buildings).
- Galleria (Retail): 2 Basements + Lower Ground + Ground + 2 floors (Completed).
- i-Rise: G + 2 floors (To be demolished).
Layout and design
The project is designed to meet LEED standards for energy efficiency and sustainability. The master plan includes a dedicated green belt area of 13,291.54 sq. m on mother earth, which exceeds the mandatory 10% requirement. The applicant has also earmarked a Miyawaki plantation area within the premises.
Traffic movement is planned at the ground floor level for the entire campus, with a dedicated fire tender movement plan. The project includes nine rainwater harvesting tanks with a total capacity of 1,900 cubic metres per day (cmd).
Water, power and access
During the operation phase, the total water requirement is estimated at 5,344 cmd. Fresh water demand of 2,314 cmd will be met through the Maharashtra Industrial Development Corporation (MIDC) supply. Recycled water (2,975 cmd) will be used for flushing, gardening, and HVAC cooling to achieve zero liquid discharge (ZLD).
Waste water of approximately 3,794 cmd will be treated in individual Sewage Treatment Plants (STPs) for each IT building and grouped STPs for the residential buildings. The applicant proposes to use Moving Bed Biofilm Reactor (MBBR) and Sequential Batch Reactor (SBR) technologies for treatment.
The total power requirement is estimated at 34,920 KVA, supplied by the Maharashtra State Electricity Distribution Company Limited (MSEDCL). For emergency backup, 26 diesel generator (DG) sets of various capacities (ranging from 600 KVA to 1,500 KVA) are proposed.
Access to the site is provided via the 60-metre wide Thane-Belapur Road. The Ghansoli railway station is located approximately 560 metres from the site.
Environmental safeguards
Solid waste generation is estimated at 14,621 kg/day. Biodegradable waste (5,848 kg/day) will be treated in on-site Organic Waste Converters (OWC), and the resulting compost will be used for landscaping. Non-biodegradable waste will be disposed of through the Navi Mumbai Municipal Corporation (NMMC) or authorized scrap dealers.
Excavation for the new basements will generate approximately 60,000 cubic metres of material, of which 41,000 cubic metres will be reused for backfilling on-site. The remaining 19,000 cubic metres will be disposed of at MIDC-designated sites.
| Item | Detail |
|---|---|
| Total Construction Area | 8,18,773.81 sq. m |
| Total Occupancy | 62,186 persons |
| Fresh Water Requirement | 2,314 cmd |
| Total Solid Waste | 14,621 kg/day |
| Power Requirement | 34,920 KVA |
| Proposed Trees to be Planted | 217 |
| Existing Trees on Site | 997 |
Aurum Real Estate Environmental Clearance for Proposed Expansion in Construction of LOMA IT Park Now Known As Q Parc' with IT Offices and Residential Support Service Located site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30 acres, this one is larger than 88% of them.
205 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghainsoli Tarf Khairne, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed expansion in construction of LOMA IT Park… — more information requested, 0 m away
- Application for Transfer of Environmental Clearnace in the name Aurum Real… — environmental approval granted, 0 m away
- Expansion in Environment Clearance for Proposed Data Center Project… — environmental approval granted, 300 m away
- Expansion in Environment Clearance for Proposed Data Center Project… — cleared for impact study, 300 m away
- Proposed Data Center Project "ACXNMI-01" by M/s Support Properties Pvt. Ltd. — environmental approval granted, 300 m away
- Proposed Data Center Project "ACXNMI-01" by M/s Support Properties Pvt. Ltd. — cleared for impact study, 300 m away
- Transfer of EC obtained by M/s Eternus Real Estate Pvt Ltd. to M/s Innovant… — under environmental review, 450 m away
- Data Center Project "ACXNMI Site-02" by M/s Innovant Buildwell Pvt. Ltd. — more information requested, 450 m away
More from Aurum Real Estate Developers Limited in Thane
- Application for Transfer of Environmental Clearnace in the name Aurum Real… — environmental approval granted