One of 3 filings for this project. The project's main page, with every filing and where each stands: 150 KLPD Distillery by using C/ B heavy Molasses/ Cane Syrup
Project details
| Official title | Establishment of 150 KLPD Distillery by using C/ B heavy Molasses/ Cane Syrup along with 3 MW Electricity Generation at A/p Ashok Nagar, Umri, Tal: Kaij, Dist: Beed, Maharashtra |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Mar 2025 |
| Application filed | 20 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gangamauli Sugar & Allied Industries Private Limited |
| Land area | 15.9 acres (6.4 ha) |
| Project cost | ₹175 crore |
| Village / locality | Umri |
| Taluk / tehsil | Kaij |
| District | Bid |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08679 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jun 2026 | Environmental approval granted | 15.9 acres | ₹175 crore |
| New project filed 5 Dec 2025 | Returned to applicant | 15.9 acres | ₹175 crore |
| Early planning filed 20 Mar 2025 (this page) | Cleared for impact study | 15.9 acres | ₹175 crore |
In context
17 applications in Bid since January 2022 are in the same category (Industry): 10 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 15.9 acres, this one is smaller than 94% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umri, Kaij, Bid, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 150 KLPD Distillery by using C/ B heavy Molasses/ Cane Syrup — environmental approval granted, 0 m away
- 150 KLPD Distillery by using C/ B heavy Molasses/ Cane Syrup — returned to applicant, 0 m away
- Environmental Clearance for the Basalt Stone Quarry of Shri. Gayasuddin… — environmental approval granted, 3.9 km away
- Minor Mineral (Stone & Murrum) Quarry Project Lease Area: 1.00 Ha, Survey/Gat… — environmental approval granted, 4.1 km away
- Environmental Clearance for the Stone Quarry of Shri. Rameshwar Mohanrao… — environmental approval granted, 10.6 km away
- Dharur (Stone & Murrum) Quarry Project having Mine Lease Area: 2.00 Ha.,… — environmental approval granted, 11.1 km away
- Environmental Clearance Application for proposed basalt stone quarry located… — environmental approval granted, 12 km away
- Environmental Clearance for Proposed Basalt Stone Quarry Gut No.232, Area-… — environmental approval granted, 12.6 km away
All 3 Gangamauli Sugar & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.