Quick answers
What is this project?
The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS No.1(pt), 31(pt), 33,34(pt), 35(pt), 36(pt) and 39(pt), of Village - Oshiwara, Oshiwara MHADA layout, Andheri(w), Mumbai is a lapsed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 2.1 acres.
Who is building it?
The applicant is Lotus Developers.
Has it been approved?
No. The application was lapsed on 6 Apr 2026, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹455 crore and a site of 2.1 acres.
When was it filed?
The application was filed on 2 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Apr 2026 |
| Application filed | 2 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Lotus Developers |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹455 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08716 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jan 2026 | Environmental approval granted | 2.1 acres | ₹455 crore |
| New project filed 2 Sept 2025 (this page) | Lapsed | 2.1 acres | ₹455 crore |
What the filings say
What is planned
Lotus Logistics and Developers proposes the redevelopment of the Oshiwara Royal Sand Cooperative Housing Society (CHS) in Mumbai. The project report describes a residential cum commercial development on a plot area of 8,484.9 square metres, with a total construction area of 1,37,111.19 square metres.
The project consists of two main buildings with the following configurations:
- Building 1 (Plot A): Two levels of basement, a ground floor, two commercial floors, a podium from the 3rd to 5th floors, and residential units from the 6th to 21st floors.
- Building 2 (Plot B): Two levels of basement, a ground floor, one commercial floor, a podium from the 2nd to 6th floors, and residential units from the 7th to 36th floors.
The development is planned to include 645 residential flats. The commercial component comprises 69 shops and 24 offices.
Key Figures
| Item | Detail |
|---|---|
| Total Plot Area | 8,484.9 square metres |
| Total Construction Area | 1,37,111.19 square metres |
| Residential Units | 645 flats |
| Commercial Units | 69 shops, 24 offices |
| Total Parking | 886 four-wheeler spaces |
| Power Requirement | 8,238.24 KW |
| Sewage Treatment Capacity | 610 KLD |
| Total Solid Waste | 1,205 kg/day |
Layout and design
The layout plan indicates that the two buildings are separated by a 9.15-metre existing road, which is proposed to be widened to 13.40 metres. Building 1 is situated on the western side of the plot, while Building 2 occupies the eastern portion. The design incorporates a 6-metre wide ramp for vehicle access in both buildings.
Landscape development is planned over 1,839.89 square metres, which includes 159.45 square metres of recreational ground (RG) on the ground level and 470.4 square metres on the podium. The applicant proposes to plant 25 trees on the site.
Water, power and access
The total domestic water requirement is estimated at 414 kilolitres per day (KLD). During the dry season, the rehab building is expected to require 138 KLD of fresh water, while the sale building will require 276 KLD.
Sewage generation is projected at 221 KLD. The applicant proposes an on-site Sewage Treatment Plant (STP) with a capacity of 610 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing, landscaping, and car washing. Rainwater harvesting will be implemented through two recharge pits.
Power will be sourced from the local utility with a demand load of 8,238.24 KW. The project design includes energy-saving measures such as solar photovoltaic systems for common area lighting and solar hot water systems, aiming for 20.05% energy savings.
Access to the site is provided via existing roads, including a 36.60-metre wide existing road on the southern boundary and a 13.40-metre wide road on the eastern boundary.
Environmental safeguards
Solid waste management plans include the segregation of biodegradable and non-biodegradable waste. Approximately 803 kg/day of biodegradable waste will be treated using an organic waste converter (OWC) on-site. Non-biodegradable waste, estimated at 402 kg/day, will be handed over to authorized recyclers.
During construction, the applicant proposes to use Ready Mix Concrete (RMC) and fly ash-based building materials to reduce environmental impact. Dust suppression measures include water sprinkling and the installation of 6-metre high wind-breaking walls or barricades. Noise barriers will be installed near residential areas, and construction activities will be restricted during night hours (10:00 PM to 6:00 AM).
Redevelopment of Oshiwara Royal Sand CHS site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.1 acres, this one is larger than 53% of them.
541 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.1 km away).
Other projects nearby
- The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS… — environmental approval granted, 0 m away
- Oshiwara Royal Sand Project — withdrawn, 0 m away
- "Oshiwara Royal Sand CHS Ltd." — withdrawn, 0 m away
- Building project by Oshiwara Royal Sand CHS Ltd. — lapsed, 0 m away
- Proposed redevelopment of existing Barracks Tent. No. 641 to 720 known as… — environmental approval granted, 100 m away
- Proposed redevelopment of existing Barracks Tent. No. 641 to 720 known as… — environmental approval granted, 100 m away
- Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known… — environmental approval granted, 100 m away
- Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known… — withdrawn, 100 m away
More from Lotus Developers in Mumbai Suburban
- Oshiwara Royal Sand Project — withdrawn
- "Oshiwara Royal Sand CHS Ltd." — withdrawn
- Building project by Oshiwara Royal Sand CHS Ltd. — lapsed
5 Lotus Developers projects in Mumbai
All 6 Lotus Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.