LapsedBuildings & townships · Mumbai Suburban, Maharashtra

The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS No.1(pt), 31(pt), 33,34(pt), 35(pt), 36(pt) and 39(pt), of Village - Oshiwara, Oshiwara MHADA layout, Andheri(w), Mumbai.

The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS No.1(pt), 31(pt), 33,34(pt), 35(pt), 36(pt) and 39(pt), of Village - Oshiwara, Oshiwara MHADA layout, Andheri(w), Mumbai is a lapsed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 2.1 acres. Its stated project cost is ₹455 crore. As of 27 Nov 2026, its status is “Lapsed” (since 6 Apr 2026).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS No.1(pt), 31(pt), 33,34(pt), 35(pt), 36(pt) and 39(pt), of Village - Oshiwara, Oshiwara MHADA layout, Andheri(w), Mumbai is a lapsed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 2.1 acres.

Who is building it?

The applicant is Lotus Developers.

Has it been approved?

No. The application was lapsed on 6 Apr 2026, so it is no longer under consideration.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹455 crore and a site of 2.1 acres.

When was it filed?

The application was filed on 2 Sept 2025.

Project details

StatusLapsed
Status since6 Apr 2026
Application filed2 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantLotus Developers
Land area2.1 acres (0.9 ha)
Project cost₹455 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-08716

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Jan 2026Environmental approval granted2.1 acres₹455 crore
New project filed 2 Sept 2025 (this page)Lapsed2.1 acres₹455 crore

What the filings say

What is planned

Lotus Logistics and Developers proposes the redevelopment of the Oshiwara Royal Sand Cooperative Housing Society (CHS) in Mumbai. The project report describes a residential cum commercial development on a plot area of 8,484.9 square metres, with a total construction area of 1,37,111.19 square metres.

The project consists of two main buildings with the following configurations:

The development is planned to include 645 residential flats. The commercial component comprises 69 shops and 24 offices.

Key Figures

ItemDetail
Total Plot Area8,484.9 square metres
Total Construction Area1,37,111.19 square metres
Residential Units645 flats
Commercial Units69 shops, 24 offices
Total Parking886 four-wheeler spaces
Power Requirement8,238.24 KW
Sewage Treatment Capacity610 KLD
Total Solid Waste1,205 kg/day

Layout and design

The layout plan indicates that the two buildings are separated by a 9.15-metre existing road, which is proposed to be widened to 13.40 metres. Building 1 is situated on the western side of the plot, while Building 2 occupies the eastern portion. The design incorporates a 6-metre wide ramp for vehicle access in both buildings.

Landscape development is planned over 1,839.89 square metres, which includes 159.45 square metres of recreational ground (RG) on the ground level and 470.4 square metres on the podium. The applicant proposes to plant 25 trees on the site.

Water, power and access

The total domestic water requirement is estimated at 414 kilolitres per day (KLD). During the dry season, the rehab building is expected to require 138 KLD of fresh water, while the sale building will require 276 KLD.

Sewage generation is projected at 221 KLD. The applicant proposes an on-site Sewage Treatment Plant (STP) with a capacity of 610 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing, landscaping, and car washing. Rainwater harvesting will be implemented through two recharge pits.

Power will be sourced from the local utility with a demand load of 8,238.24 KW. The project design includes energy-saving measures such as solar photovoltaic systems for common area lighting and solar hot water systems, aiming for 20.05% energy savings.

Access to the site is provided via existing roads, including a 36.60-metre wide existing road on the southern boundary and a 13.40-metre wide road on the eastern boundary.

Environmental safeguards

Solid waste management plans include the segregation of biodegradable and non-biodegradable waste. Approximately 803 kg/day of biodegradable waste will be treated using an organic waste converter (OWC) on-site. Non-biodegradable waste, estimated at 402 kg/day, will be handed over to authorized recyclers.

During construction, the applicant proposes to use Ready Mix Concrete (RMC) and fly ash-based building materials to reduce environmental impact. Dust suppression measures include water sprinkling and the installation of 6-metre high wind-breaking walls or barricades. Noise barriers will be installed near residential areas, and construction activities will be restricted during night hours (10:00 PM to 6:00 AM).

Redevelopment of Oshiwara Royal Sand CHS site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Redevelopment of Oshiwara Royal Sand CHS: Master layout plan: Building 1 and Building 2 with internal roads and ramps (preview)🔒 Sign in free to see it
Master layout plan: Building 1 and Building 2 with internal roads and ramps
Redevelopment of Oshiwara Royal Sand CHS: Landscape layout: Ground and podium level green spaces (preview)🔒 Sign in free to see it
Landscape layout: Ground and podium level green spaces
Redevelopment of Oshiwara Royal Sand CHS: Site plan showing plot boundaries and road widening areas (preview)🔒 Sign in free to see it
Site plan showing plot boundaries and road widening areas
Redevelopment of Oshiwara Royal Sand CHS: STP Flow Diagram: MBBR technology process for wastewater treatment (preview)🔒 Sign in free to see it
STP Flow Diagram: MBBR technology process for wastewater treatment

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.1 acres, this one is larger than 53% of them.

541 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.1 km away).

Other projects nearby

More from Lotus Developers in Mumbai Suburban

5 Lotus Developers projects in Mumbai
All 6 Lotus Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.