One of 2 filings for this project. The project's main page, with every filing and where each stands: S. R. Scheme under Regulation 33(10) of DCPR 2034 for Yadav Nagar CHS (Prop) situated on…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Dec 2025 |
| Application filed | 20 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sky Lark Buildcon Private Limited |
| Use | Residential |
| Land area | 1.7 acres (0.7 ha) |
| Built-up area | 74,389 m² (8,00,716 sq ft) |
| Project cost | ₹160 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08726 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 20 Apr 2026 | Environmental approval granted | 1.7 acres | ₹160 crore |
| New project filed 20 Sept 2025 (this page) | Environmental approval granted | 1.7 acres | ₹160 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.7 acres, this one is smaller than 54% of them.
463 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- S. R. Scheme under Regulation 33(10) of DCPR 2034 for Yadav Nagar CHS (Prop)… — environmental approval granted, 0 m away
- Environmental clearance for Expansion of proposed residential project on sub… — lapsed, 100 m away
- Environmental Clearance for Expansion of Proposed Residential Project on Sub… — environmental approval granted, 100 m away
- Environmental Clearance for Expansion of Proposed Residential Project on Sub… — cleared for impact study, 100 m away
- Proposed Residential Building on Plot bearing C.S. No. 1/434, Lower Parel… — cleared for impact study, 200 m away
- Proposed Residential Building on Plot bearing C.S. No. 1/434, Lower Parel… — environmental approval granted, 200 m away
- Proposed Commercial building on plot bearing CS no. 1/266 of Lower Parel… — environmental approval granted, 250 m away
- Application for Amendment / Expansion in EC for Residential project on plot… — cleared for impact study, 350 m away
More from Sky Lark Buildcon Private Limited in Mumbai
- Proposed Expansion of mixed-use project at Mahim Division, Part of Lower Parel… — environmental approval granted
- Proposed Expansion of mixed-use project at Mahim Division, Part of Lower Parel… — cleared for impact study
- Building project by ProposedAmalgamatedS.R.SchemeUnderRegulation33(10)ofDCR1991… — cleared for impact study
All 5 Sky Lark Buildcon projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.