Project details
| Status | Not approved |
|---|---|
| Status since | 18 Dec 2025 |
| Application filed | 8 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dipak Patel |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹58 lakh |
| Village / locality | Pimpri Sayyad |
| Taluk / tehsil | Nashik |
| District | Nashik |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08853 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jan 2025 (this page) | Not approved | 4.9 acres | ₹58 lakh |
| New project filed 7 Jan 2025 | Not approved | 4.3 acres | ₹50 lakh |
In context
195 applications in Nashik since January 2022 are in the same category (Mining): 137 approved, 16 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Pimpri Sayyad, Nashik, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Nilesh Dilip Bora — lapsed, 200 m away
- Shri. Nilesh Bora — not approved, 200 m away
- Residential and Non-Residential Infrastructure in Phase-I for Establishment of… — under environmental review, 2.5 km away
- Integration of Parallel Runway Strip With Existing Runway Strip at Existing… — cleared for impact study, 6 km away
- Amendment in Environment Clearance for proposed residential and commercial… — environmental approval granted, 7.6 km away
- Environment Clearance for Proposed Residential Project "Nandan Carnival", at… — lapsed, 7.6 km away
- "Parksyde Homes Commercial" By M/s. Jaikumar Constructions Limited. — environmental approval granted, 10.2 km away
- "Parksyde Homes Commercial" By M/s. Jaikumar Constructions Limited — withdrawn, 10.2 km away
More from Dipak Patel in Nashik
- Shri Nilesh Dilip Bora — lapsed
- Shri. Nilesh Dilip Bora — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.