Quick answers
What is this project?
Proposed redevelopment Under reg 33(11) of existing residential society known as "WEST COAST CHS Ltd" on plot Bearing CTS No.1176(B), of Village Versova at Jayprakash Road, Versova, Andheri (W), Mumbai by M/s Keystone Realtors Ltd is a lapsed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.5 acres.
Who is building it?
The applicant is Keystone Realtors Limited (Rustomjee).
Has it been approved?
No. The application was lapsed on 4 Feb 2026, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹444.6 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 2 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed redevelopment Under reg 33(11) of existing residential society known as "WEST…
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Feb 2026 |
| Application filed | 2 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Keystone Realtors Limited (Rustomjee) |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹444.6 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08875 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jul 2025 (this page) | Lapsed | 1.5 acres | ₹444.6 crore |
| New project filed 9 Dec 2024 | Recommended by coastal authority | 1.5 acres | ₹444.6 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 58% of them.
448 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (13.5 km away).
Other projects nearby
- EC+CRZ for Proposed S.R Scheme Under reg 33(11) of DCPR 2034"WEST COAST CHS… — recommended by coastal authority, 0 m away
- Proposed redevelopment Under reg 33(11) of existing residential society known… — recommended by coastal authority, 0 m away
- Proposed Redevelopment of Residential Cum Commercial Building on Plot Bearing… — recommended by coastal authority, 200 m away
- CRZ Clearance for land bearing C.T.S. NO. 832/1 OF village Ambivali, at J.P.… — recommended by coastal authority, 200 m away
- Request for revision of Coastal Zone Management Plan (CZMP) Classification… — withdrawn, 200 m away
- Proposed redevelopment of existing building on plot bearing C.T.S. no. 832/1… — environmental approval granted, 200 m away
- Proposed redevelopment of existing building on plot bearing C.T.S. no. 832/1… — recommended by coastal authority, 200 m away
- Proposed redevelopment of existing building on plot bearing C.T.S. no. 832/1… — withdrawn, 200 m away
More from Keystone Realtors Limited (Rustomjee) in Mumbai Suburban
- EC+CRZ for Proposed S.R Scheme Under reg 33(11) of DCPR 2034"WEST COAST CHS… — recommended by coastal authority
- Amendment in EC for the proposed redevelopment scheme is under 33(10) &… — environmental approval granted
- Proposed Slum Rehabilitation Scheme on slum & non-slum plot bearing CTS… — environmental approval granted
9 Rustomjee projects in Mumbai
All 17 Rustomjee projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.