Quick answers
What is this project?
Proposed Redevelopment of Existing Society Building Known As 'shree Mangesh Apartment Co-Op Housing Society LTD' Located on Plot Bearing Cts No. 395a & 396 of Village Borivali, Situated in 'r/N' Ward, at Sainath Nagar, Devidas Lane, Off Eksar Road,borivali (West) Mumbai - 400 103. by M/S Sahakar Builders and Developers is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans 1 tower of up to 30 floors on 0.9 acres.
Who is building it?
The applicant is Sahakar Builders & Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jan 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹125 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 18 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Redevelopment of Existing Society Building Known As 'shree Mangesh Apartment…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jan 2026 |
| Application filed | 18 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sahakar Builders & Developers |
| Use | Residential |
| Towers | 1 |
| Floors (tallest) | 30 |
| Basements | 1 |
| Land area | 3,500 m² |
| Built-up area | 28,449 m² (3,06,222 sq ft) |
| Project cost | ₹125 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08948 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 1 Apr 2026 | Environmental approval granted | 0.9 acres | ₹125 crore |
| New project filed 18 Aug 2025 (this page) | Environmental approval granted | 0.9 acres | ₹125 crore |
What the filings say
What is planned
Sahakar Builders and Developers proposes the redevelopment of the Shree Mangesh Apartment Co-operative Housing Society Ltd in Borivali West, Mumbai. The project involves the construction of a single residential building on a plot area of 0.35 hectares (0.86 acres).
According to the project documents, the building configuration includes a basement for a pump room, a stilt level, two levels of podium (1A & 1B), a second and third podium, a fourth floor (E-deck), and residential floors from the 5th to the 30th floor. The total construction area is stated as 15,381.20 square metres.
Layout and design
The layout plan indicates a single tower structure with a maximum building line and elevation line defined within the plot boundaries. The design includes a dedicated "E-Deck" on the 4th floor. A grass paver area for the Landscape Open Space (LOS) is designed to bear the load of fire engines weighing up to 58 metric tonnes with a point load of 10 tonnes per square metre. The total proposed LOS area is 695.08 square metres.
Access to the site is provided via the existing 27.45-metre wide Devidas Road. The plan also shows a 6.70-metre wide access path (22 feet) to the rear side of the plot.
Water, power and access
The total water requirement for the project is estimated at 102 kilolitres per day (KLD). This demand remains consistent across both monsoon and non-monsoon seasons. The primary source of fresh water will be the Municipal Corporation of Greater Mumbai (MCGM).
| Item | Detail |
|---|---|
| Total Water Requirement | 102 KLD |
| Fresh Water (from MCGM) | 63 KLD |
| Recycled Water (Flushing & Landscaping) | 39 KLD (Non-Monsoon) / 32 KLD (Monsoon) |
| Sewage Generation | 83 KLD |
| STP Capacity | 90 KLD |
| Sludge Generated | 5 kg/day |
| Excess Treated Water to Sewer | 35-36 KLD |
For power backup, Diesel Generator (DG) sets equipped with acoustic enclosures will be installed.
Environmental safeguards
The applicant has outlined an Environment Management Plan (EMP) for both construction and operation phases. During construction, mitigation measures include water sprinkling to control dust, 6.0-metre high site barricades, and the use of Ready Mix Concrete (RMC) to reduce onsite material handling. Topsoil removed during excavation will be preserved and reused for landscaping.
For the operation phase, the project includes:
- Sewage Treatment: A Sewage Treatment Plant (STP) with a capacity of 90 KLD to treat domestic and flushing waste.
- Waste Management: Segregation of biodegradable and non-biodegradable waste. An Organic Waste Converter (OWC) will be provided for onsite treatment of biodegradable waste. E-waste collection bins will also be installed.
- Traffic Management: Speed breakers will restrict internal vehicle speeds to 10 km/hr. Pedestrian strips and crossings are planned to ensure safety.
- Air and Noise: Green belt development around the project periphery to mitigate noise and air pollution impacts.
Sahakar Builders and Redevelopment of Existing Society Building Known As 'shree Mangesh Apartment Co-Op Housing Society LTD' Located site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.9 acres, this one is smaller than 78% of them.
361 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (14.5 km away).
Other projects nearby
- Proposed Redevelopment of Existing Society Building Known As 'shree Mangesh… — environmental approval granted, 0 m away
- Expansion in Environment Clearance of Proposed Redevelopment of Existing… — environmental approval granted, 0 m away
- Proposed Residential Development – 'Verve Elina' on plot bearing CTS No.… — environmental approval granted, 100 m away
- Environment Clearance for Proposed redevelopment of building known as… — environmental approval granted, 300 m away
- Proposed Building & Construction at S.No. 61, H.No. 98, CTS No.444B, S No. 62,… — environmental approval granted, 400 m away
- Proposed Redevelopment of existing building by M/s. Konark Shakti Developers — environmental approval granted, 450 m away
- Proposed expansion in redevelopment of Vithal Mandir CHSL on CTS No 1430 by… — environmental approval granted, 500 m away
- Proposed Redevelopment Project under DCR 33 (9) on plot bearing C.T.S. No.… — environmental approval granted, 500 m away
More from Sahakar Builders & Developers in Mumbai Suburban
- Expansion in Environment Clearance of Proposed Redevelopment of Existing… — environmental approval granted
- Expansion in Environment Clearance for Proposed development on plot bearing… — environmental approval granted
- Proposed development on sub plot A for property bearing CTS no. 3A, 3B, 3/1,… — environmental approval granted
- Proposed redevelopment of Tilak CHS LTD on plot bearing CTS No. 1500/A/1/B of… — environmental approval granted
- Proposed development on sub plot A for property bearing CTS no. 3A, 3B, 3/1,… — environmental approval granted
- Expansion in Environment Clearance for Proposed redevelopment on plot bearing… — environmental approval granted
All 10 Sahakar Builders & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.