Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Mar 2026 |
| Application filed | 12 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shree Balajivishwa Buildcon LLP |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹90.6 crore |
| Village / locality | Moshi |
| Taluk / tehsil | Haveli |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09105 |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.9 acres, this one is smaller than 80% of them.
171 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Moshi, Haveli, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential & Commercial construction Project "Rivera" — environmental approval granted, 200 m away
- Proposed Project at Dudulgaon, PCMC, Pune by M/s DMK Infrastructure Pvt Ltd — environmental approval granted, 350 m away
- Proposed Residential and Commercial project "24Liife Prospeeria" — environmental approval granted, 450 m away
- Proposed Residential & Commercial Project at Gat No 216/1A (P), Village… — under environmental review, 500 m away
- Proposed Residential & Commercial Project at Gat No 216/1A (P), Village… — initial checks, 500 m away
- Proposed Residential and Commercial project "Landmarkk Acee" — environmental approval granted, 650 m away
- Proposed Residential & Commercial construction project " Hexa Tower " (… — environmental approval granted, 700 m away
- Proposed Residential & Commercial development project "Coral Nest" at Gat. no.… — withdrawn, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.