Environmental approval grantedBuildings & townships · Mumbai, Maharashtra

Proposed Residential cum Commercial project is located at C.S. No.383(Pt.),1/383, 389, 390, 397 and 413(Pt.) of Tardeo Division at Keshavrao Khadye Marg, Mahalaxmi in D ward Mumbai-400 034

Proposed Residential cum Commercial project is located at C.S. No.383(Pt.),1/383, 389, 390, 397 and 413(Pt.) of Tardeo Division at Keshavrao Khadye Marg, Mahalaxmi in D ward Mumbai-400 034 is an approved mixed-use project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 18.4 acres. Its stated project cost is ₹4,805.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Dec 2025).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since22 Dec 2025
Application filed21 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantTwenty Five Downtown Realty Limited
UseMixed use
Land area18.4 acres (7.5 ha)
Built-up area10,70,111 m² (1,15,18,568 sq ft)
Plot area74,536 m² (8,02,298 sq ft)
Project cost₹4,805.7 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09334

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Mar 2025 (this page)Environmental approval granted18.4 acres₹4,805.7 crore
Early planning filed 13 Feb 2025Cleared for impact study18.4 acres₹4,805.7 crore
Early planning filed 24 Dec 2024Cleared for impact study18.4 acres₹4,805.7 crore
Early planning filed 12 Aug 2024Cleared for impact study18.4 acres₹4,805.7 crore

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 18.4 acres, this one is larger than 90% of them.

472 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Twenty Five Downtown Realty projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.