Quick answers
What is this project?
Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area, Tal. Khandala, Dist. Satara by M/s. Mukand Sumi Metal Processing Limited is a withdrawn industrial building project in Lonand, Khandala, Satara, Maharashtra. The site covers 39.6 acres.
Who is building it?
The applicant is Mukand Sumi Metal Processing Limited.
Has it been approved?
No. The application was withdrawn on 25 Feb 2025, so it is no longer under consideration.
Where is it?
In Lonand, Khandala, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹184.9 crore and a site of 39.6 acres.
When was it filed?
The application was filed on 29 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area,…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 25 Feb 2025 |
| Application filed | 29 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mukand Sumi Metal Processing Limited |
| Use | Industrial |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹184.9 crore |
| Village / locality | Lonand |
| Taluk / tehsil | Khandala |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09348 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Apr 2025 | Environmental approval granted | 39.6 acres | ₹184.9 crore |
| New project filed 29 Jan 2025 (this page) | Withdrawn | 39.6 acres | ₹184.9 crore |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 39.6 acres, this one is larger than 67% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lonand, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand… — environmental approval granted, 0 m away
- Pushpak Steel Industries Pvt Ltd Lonand — more information requested, 550 m away
- Enhancement in Production of Grain Based Distillery (100 KLPD to 130 KLPD) at… — initial checks, 600 m away
- Proposed Expansion and Modernization of Integrated Mini Steel Plant from 0.3… — cleared for impact study, 1.1 km away
- Proposed Industrial Shed at Gat No. 211/1, 212, 214, 215, 216, Plot No.2,… — environmental approval granted, 3.7 km away
- Proposed Industrial shed at Gat No -211/1, 212, 214(P),215, 216 (P),… — lapsed, 3.7 km away
- Proposed "Industrial Shed" Located at Gat No. 211 / 1, 212, 214, 215, 216 (P),… — more information requested, 3.9 km away
- Diversion of Forest Land for Laying of Underground Gravity Distribution… — in-principle approval, conditions pending, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.