What is Developing? Open the mapMap

WithdrawnBuildings & townships · Satara, Maharashtra

Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area, Tal. Khandala, Dist. Satara by M/s. Mukand Sumi Metal Processing Limited

Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area, Tal. Khandala, Dist. Satara by M/s. Mukand Sumi Metal Processing Limited is a withdrawn industrial building project in Lonand, Khandala, Satara, Maharashtra. The site covers 39.6 acres. Its stated project cost is ₹184.9 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 25 Feb 2025).

See it on the live map All projects in Satara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area, Tal. Khandala, Dist. Satara by M/s. Mukand Sumi Metal Processing Limited is a withdrawn industrial building project in Lonand, Khandala, Satara, Maharashtra. The site covers 39.6 acres.

Who is building it?

The applicant is Mukand Sumi Metal Processing Limited.

Has it been approved?

No. The application was withdrawn on 25 Feb 2025, so it is no longer under consideration.

Where is it?

In Lonand, Khandala, Satara, Maharashtra.

How big is it?

It has a stated cost of ₹184.9 crore and a site of 39.6 acres.

When was it filed?

The application was filed on 29 Jan 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area,…

Project details

StatusWithdrawn
Status since25 Feb 2025
Application filed29 Jan 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantMukand Sumi Metal Processing Limited
UseIndustrial
Land area39.6 acres (16 ha)
Project cost₹184.9 crore
Village / localityLonand
Taluk / tehsilKhandala
DistrictSatara
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09348

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Apr 2025Environmental approval granted39.6 acres₹184.9 crore
New project filed 29 Jan 2025 (this page)Withdrawn39.6 acres₹184.9 crore

In context

52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 39.6 acres, this one is larger than 67% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Lonand, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.