One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Collector office Building at Survey No.6980 & 7480 , Situated at labour colony,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Dec 2025 |
| Application filed | 17 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Deelip Veerpakshappa Swami |
| Land area | 13.7 acres (5.5 ha) |
| Project cost | ₹13 crore |
| Village / locality | Aurangabad |
| Taluk / tehsil | Aurangabad |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09388 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Mar 2025 (this page) | Lapsed | 13.7 acres | ₹13 crore |
| New project filed 17 Mar 2025 | Environmental approval granted | 13.7 acres | ₹13 crore |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13.7 acres, this one is smaller than 55% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Collector office Building at Survey No.6980 & 7480 , Situated at… — environmental approval granted, 0 m away
- 280 Residential Quarters (252 Of Type II & 28 Of Type III) for S.P.… — environmental approval granted, 1.7 km away
- 280 Residential Quarters (252 of Type II & 28 of Type III) For S.P.Aurangabad… — lapsed, 1.7 km away
- Environmental Clearance for Proposed construction of New Surgical Building of… — under environmental review, 1.8 km away
- Proposed Mahatma Gandhi Mission Trust, MGM Stadium & Club plot, MGM Campus,… — environmental approval granted, 2.5 km away
- Mahatma Gandhi Mission Trust, Education and allied use campus on Education… — environmental approval granted, 2.7 km away
- Mahatma Gandhi Mission Trust, Education and allied use campus on Education… — withdrawn, 2.7 km away
- Commercial Project by Aboli Advisors LLP — not approved, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.