Project details
| Status | More information requested |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 22 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Poshs Metal Aurangabad LLP |
| Land area | 43.8 acres (17.7 ha) |
| Project cost | ₹166.4 crore |
| Village / locality | Potul |
| Taluk / tehsil | Gangapur |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09691 |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 43.8 acres, this one is larger than 71% of them.
Where it is
Potul, Gangapur, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Warzadi Stone & Murrum Quarry mining project located at Gut No. 25… — environmental approval granted, 5.9 km away
- Stone Quarry proposal of M/s. A. G. Construction,Through Mr. Mohammad Arif… — environmental approval granted, 6.1 km away
- Stone Quarry proposal of M/s. P. V. Patil Construction — environmental approval granted, 6.2 km away
- Stone quarry proposal of M/s. Kamal Stone Crusher,Through Mr. Atul Sambhaji… — environmental approval granted, 6.2 km away
- Stone Quarry proposal of M/s. Sant Satramdas Infrastructure Pvt. Ltd.,Through… — environmental approval granted, 6.2 km away
- Stone Quarry proposal of M/s. A. G. Construction,Through Mr. Mohammad Arif… — environmental approval granted, 6.2 km away
- Stone quarry proposal of M/s. P. V. Patil Construction — environmental approval granted, 6.2 km away
- Revalidation of Environmental Clearance for the Basalt Stone Quarry, located… — environmental approval granted, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.