Quick answers
What is this project?
Slum Rehabilitation Scheme of Shivaji Nagar (Chembur) SRA Co Op Housing Society. Ltd. at Plot bearing CTS. No. 385 of Chembur Division, Mumbai State: Maharashtra by M/s. Surana Construction (Chembur) is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1 acre.
Who is building it?
The applicant is M/S. Surana Construction (Chembur).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Mar 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹95.3 crore and a site of 1 acre.
When was it filed?
The application was filed on 7 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Mar 2026 |
| Application filed | 7 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | M/S. Surana Construction (Chembur) |
| Use | Residential |
| Land area | 4,000 m² |
| Built-up area | 33,460 m² (3,60,160 sq ft) |
| Project cost | ₹95.3 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09698 |
What the filings say
What is planned
M/s. Surana Construction (Chembur) is proposing an expansion of the Slum Rehabilitation Scheme for the Shivaji Nagar (Chembur) SRA Co-operative Housing Society. The project is located on a plot of 4,017 square metres (0.4 hectares) in the Chembur Division of Mumbai. The applicant's project report indicates that the project is currently under construction.
The development consists of two primary wings, Rehab and Sale, with the following configuration:
- Rehab Wing: Two basements and 15 floors.
- Sale Wing: Two basements and 15 floors.
The total built-up area is 33,459.76 square metres, comprising an FSI (Floor Space Index) area of 21,764.07 square metres and a non-FSI area of 11,695.69 square metres. The project is designed to accommodate a total population of 3,179 persons, including residents and a floating population.
Layout and design
The ground floor plan shows separate entrances for the Rehab and Sale wings. The layout includes a dedicated area for a temple (Mandir) of ground plus one upper floor, with the existing temple on-site slated for demolition. The ground floor also features several rehab shops, a society office, and a sale office.
Parking is planned for 245 four-wheelers and 24 two-wheelers. The design incorporates car lifts (3.50 m x 6.00 m) for vehicle movement between levels. A buffer zone is maintained along the boundary as per Metro Rail requirements, as the site is adjacent to the S.G. Barve Marg.
Water, power and access
The total water requirement for the project is estimated at 224 KLD (kilolitres per day). Sewage generation is expected to be 197 KLD. The applicant proposes to install a Sewage Treatment Plant (STP) with a capacity of 200 KLD using RMBR (Rotating Membrane Bio-Reactor) technology, located on the north-east side of the plot.
Power will be sourced from Adani Power, with a connected load of 3,321.80 KW and a maximum demand of 1,545.40 KW. The project includes energy-saving measures such as LED lighting and solar panels, intended to achieve a 5% saving (approximately 80 KW).
| Item | Detail |
|---|---|
| Total Built-up Area | 33,459.76 sq. m. |
| FSI Area | 21,764.07 sq. m. |
| Non-FSI Area | 11,695.69 sq. m. |
| STP Capacity | 200 KLD |
| OWC Capacity | 700 kg/day |
| RWH Tank Capacity | 70 cubic metres |
| Total Population | 3,179 persons |
| 4-Wheeler Parking | 245 units |
Environmental safeguards
For solid waste management, the project will generate approximately 1,093 kg/day of waste, of which 697 kg/day is biodegradable. An Organic Waste Converter (OWC) with a capacity of 700 kg/day will be installed to treat wet garbage on-site. The resulting manure will be used for landscaping within the premises.
Rainwater harvesting will be managed through a 70-cubic-metre storage tank. The project provides 307 square metres of required recreational ground (RG) area on the ground level. During the construction phase, which is estimated to last five years, the applicant has committed to dust suppression measures, including barricading the periphery, using water sprinklers, and providing earplugs and masks for workers.
Surana Construction (Chembur) Slum Rehabilitation Scheme of Shivaji Nagar Chembur SRA Co Op Housing Society. Ltd. site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 74% of them.
322 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (11.8 km away).
Other projects nearby
- Application for obtaining Environmental Clearance For S.R. Scheme Under… — withdrawn, 100 m away
- Application for obtaining Environmental Clearance For S.R. Scheme Under… — withdrawn, 100 m away
- Application for obtaining Environmental Clearance for S.R. Scheme Under… — not approved, 100 m away
- Expansion in Proposed S. R. Scheme Panchsheel SRA CHS Ltd., Ekta SRA CHS Ltd.… — environmental approval granted, 400 m away
- Application for EC (along with Consent to Establish as per MoEF&CC… — under environmental review, 500 m away
- Govt. buildings at CTS no. 469-A, Chembur Mumbai — environmental approval granted, 550 m away
- Govt. buildings at CTS no. 469-A, Chembur Mumbai — lapsed, 600 m away
- Proposed Redevelopment of Existing Building Known as "Suman Co-Operative… — environmental approval granted, 600 m away