What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Raigarh, Maharashtra

Proposed Expansion in Residential Cum Commercial Building on Plot No 25, Sector 17, New Panvel(W), Tal-Panvel, Dist-Raigad by M/S Balaji Corporation.

Proposed Expansion in Residential Cum Commercial Building on Plot No 25, Sector 17, New Panvel(W), Tal-Panvel, Dist-Raigad by M/S Balaji Corporation is an approved mixed-use project in Kasbe Panvel, Panvel, Raigarh, Maharashtra. The site covers 1.4 acres. Its stated project cost is ₹185 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 Jan 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion in Residential Cum Commercial Building on Plot No 25, Sector 17, New Panvel(W), Tal-Panvel, Dist-Raigad by M/S Balaji Corporation is an approved mixed-use project in Kasbe Panvel, Panvel, Raigarh, Maharashtra. The site covers 1.4 acres.

Who is building it?

The applicant is Balaji Corporation.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 6 Jan 2026), as of 27 Nov 2026.

Where is it?

In Kasbe Panvel, Panvel, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹185 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 12 Aug 2025.

Project details

StatusEnvironmental approval granted
Status since6 Jan 2026
Application filed12 Aug 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantBalaji Corporation
UseMixed use
Land area1.4 acres (0.6 ha)
Built-up area31,898 m² (3,43,347 sq ft)
Project cost₹185 crore
Village / localityKasbe Panvel
Taluk / tehsilPanvel
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09869

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 12 Aug 2025 (this page)Environmental approval granted1.4 acres₹185 crore
Expansion filed 26 Jun 2025Withdrawn1.4 acres₹185 crore

In context

674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.4 acres, this one is smaller than 63% of them.

175 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kasbe Panvel, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Balaji Corporation in Raigarh

3 Balaji Corporation projects in Raigarh
All 6 Balaji Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.