One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/S. Mayureshwar Stone Crusher (Shri. Bharat Malhari Khaire & Shri.…
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Dec 2025 |
| Application filed | 11 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Mayureshwar Stone Crusher |
| Land area | 9.7 acres (3.9 ha) |
| Project cost | ₹83 lakh |
| Village / locality | Vadhane |
| Taluk / tehsil | Baramati |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09891 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 19 Aug 2025 | Not approved | 9.7 acres | ₹94 lakh |
| Validity extension filed 11 Mar 2025 (this page) | Lapsed | 9.7 acres | ₹83 lakh |
In context
181 applications in Pune since January 2022 are in the same category (Mining): 97 approved, 9 filed or under review, and 75 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 9.7 acres, this one is larger than 86% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 32.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Vadhane, Baramati, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S. Mayureshwar Stone Crusher (Shri. Bharat Malhari Khaire… — not approved, 0 m away
- Shri. Mahendra Tukaram Thorat Shri. Umesh Vasantrao Thorat — more information requested, 200 m away
- Environmental Clearance for Basalt Stone quarry of M/S. Atharv Enterprises… — environmental approval granted, 300 m away
- Shri. Rushikesh Tukaram Dhaygude — environmental approval granted, 300 m away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.40 ha) at Gut… — environmental approval granted, 400 m away
- Smt. Sayali Rushikesh Dhaygude, Mr. Somnath Laxman Gaikwad — environmental approval granted, 550 m away
- Shri. Samadhan manik Kokare, Smt. Janabhai Manik Kokare, Miss. Seema Manik… — environmental approval granted, 600 m away
- Shri. Akshay Ramchandra Gaikwad,Shri. Pankaj Trimbak Jadhav, Smt. Sonali… — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.