Quick answers
What is Residential project by M/s. Shreeji Sharan Realtors LLP?
This approved residential project by M/s. Shreeji Sharan Realtors LLP is in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
Who is building it?
The applicant is Shreeji Sharan Realtors LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Aug 2025), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹285 crore.
When was it filed?
The application was filed on 6 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Aug 2025 |
| Application filed | 6 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shreeji Sharan Realtors LLP |
| Use | Residential |
| Built-up area | 84,885 m² (9,13,694 sq ft) |
| Project cost | ₹285 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10115 |
What the filings say
What is planned
Shreeji Sharan Realtors LLP proposes a residential and commercial development on a plot of 7,921.00 square metres (1.95 acres). The project has a total proposed built-up area of 77,993.09 square metres.
The development consists of three main composite buildings and a sale building, featuring residential units, shops, and a school. The planned components include:
- Composite Building 01: Ground plus 7 floors (Height: 23.80 metres).
- Composite Building 02: Ground plus 7 floors (Height: 23.80 metres).
- Composite Building 03:
- School Wing A: Ground plus 7 floors (Height: 29.70 metres).
- Rehab Wing B: Ground plus 21 floors, including refuge floors at the 8th and 15th levels (Height: 64.40 metres).
- Rehab Wing C: Ground plus 23 floors, including refuge floors at the 8th, 15th, and 21st levels (Height: 69.90 metres).
- Sale Building: Ground plus 9 typical podium floors, an E-deck floor, and 34 typical floors (Height: 186.80 metres).
The project will provide a total of 468 flats, 34 shops, and one school. The total population is estimated at 3,656 persons.
Layout and design
The site layout includes internal driveways of 6.0 metres, 9.20 metres, and 9.25 metres in width. The project features a podium line and specific areas designated as open to sky. A recreational ground (RG) area of 608.48 square metres is planned.
Parking facilities are divided between sale and rehab components:
- Sale: 242 four-wheeler and two-wheeler spaces.
- Rehab: 30 spaces.
- School: 4 spaces.
Land and surroundings
The project is located at Village Kandivali, Sector-9 of Mahavir Nagar, Kandivali (West) in the Mumbai Suburban district. The site is situated at latitude 19°12'52.32"N and longitude 72°50'39.94"E.
Nearby landmarks and infrastructure include:
- Transport: Western Express Highway (2.15 km), Kandivali Railway Station (1.30 km), and Manthanpada Road adjacent to the site.
- Water Bodies: Malad Creek (2.71 km), Manori Creek (2.90 km), and Kandivali Gaon Talav (0.84 km).
- Environment: Sanjay Gandhi National Park is within a 2.70 km radius, and a CRZ area is within 1.80 km.
- Industry: Hari Steel Industries is located approximately 0.58 km from the site.
Water, power and access
The total water requirement is estimated at 342 kilolitres per day (KLD). Fresh water (216 KLD) will be sourced from the Municipal Corporation of Greater Mumbai (MCGM). Recycled water (126 KLD) will be used for flushing and landscaping.
Power requirement for the project is 2,200 KW. The applicant plans to install two Diesel Generator (DG) sets with capacities of 300 KVA and 600 KVA for backup power. Access to the site is provided via existing 18.30-metre and 12.20-metre wide roads.
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 325 KLD using Moving Bed Bio Reactor (MBBR) technology will be installed below ground. The plant will treat an estimated 296 KLD of sewage.
Solid waste management plans include:
- Organic Waste: 0.584 tonnes per day (TPD) to be treated in an Organic Waste Converter (OWC) and used as manure.
- Inorganic Waste: 0.392 TPD to be handed over to local authorities.
- Construction Waste: Excavated topsoil will be used for landscaping, and debris will be used for backfilling or road construction.
Rainwater harvesting will be implemented using two storage tanks. Energy-saving measures include LED lighting in common areas, solar street lights, and water level controllers with timers. The applicant plans to plant trees at a rate of 80 trees per hectare along the road and plot periphery.
Shreeji Sharan Realtors Residential Project site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval.
505 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (13.2 km away).
Other projects nearby
- Expansion in Environment Clearance for Proposed redevelopment on plot bearing… — environmental approval granted, 250 m away
- Proposed redevelopment on plot bearing C.T.S. No. 89C of Kandivali, village… — environmental approval granted, 250 m away
- Environmental Clearance for Proposed Cluster Redevelopment Scheme – 33(9) of… — withdrawn, 250 m away
- Environmental Clearance for Proposed Cluster Redevelopment Scheme – 33(9) of… — withdrawn, 250 m away
- Environmental Clearance for Proposed Cluster Redevelopment Scheme – 33(9) of… — withdrawn, 250 m away
- Environmental Clearance for Proposed Cluster Redevelopment Scheme – 33(9) of… — lapsed, 250 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — under environmental review, 300 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — under environmental review, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.