One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Amendment & Expansion of Slum Rehabilitation Scheme at plot bearing CS no. 426,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 May 2025 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Alperton Developers and Contractors Private Limited |
| Use | Residential |
| Land area | 26.7 acres (10.8 ha) |
| Built-up area | 12,11,349 m² (1,30,38,840 sq ft) |
| Project cost | ₹2,927.9 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10327 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Jul 2026 | Environmental approval granted | 26.7 acres | ₹2,941.6 crore |
| Early planning filed 16 May 2026 | Under environmental review | 26.7 acres | ₹2,941.6 crore |
| Expansion filed 11 Jul 2025 | Environmental approval granted | 26.7 acres | ₹2,927.9 crore |
| Early planning filed 24 Apr 2025 (this page) | Cleared for impact study | 26.7 acres | ₹2,927.9 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 26.7 acres, this one is larger than 94% of them.
472 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Amendment & Expansion of Slum Rehabilitation Scheme at plot bearing… — environmental approval granted, 0 m away
- Proposed Amendment & Expansion of Slum Rehabilitation Scheme at plot bearing… — under environmental review, 0 m away
- Proposed Amendment/Expansion of Slum Rehabilitation Scheme at plot bearing CS… — environmental approval granted, 0 m away
- Expansion of Slum Rehabilitation Scheme at plot bearing CS no. 426,… — environmental approval granted, 0 m away
- Proposed Expansion of Slum Rehabilitation Scheme located on Plot bearing C.S.… — not approved, 0 m away
- Proposed Expansion of Slum Rehabilitation Scheme located on Plot bearing C.S.… — cleared for impact study, 0 m away
- Proposed Expansion of Slum Rehabilitation Scheme at Parel Sewri Division and… — cleared for impact study, 0 m away
- Proposed Residential Development under SRA scheme "Vaibhavi CHS" C.S.No.440… — environmental approval granted, 200 m away
More from Alperton Developers and Contractors Private Limited in Mumbai
- Expansion of Slum Rehabilitation Scheme at plot bearing CS no. 426,… — environmental approval granted
All 5 Alperton Developers and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.