Quick answers
What is this project?
Proposed Expansion of Commercial office Building on plot Bearing no. C-59 'G' Block, Bandra Kurla Complex, Mumbai by M/s C59 property holdings private limited is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.3 acres.
Who is building it?
The applicant is C59 Property Holdings Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹295.4 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 16 Aug 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Aug 2025 |
| Application filed | 16 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | C59 Property Holdings Private Limited |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹295.4 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10639 |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.3 acres, this one is smaller than 62% of them.
434 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (11.9 km away).
Other projects nearby
- Proposed Redevelopment of Existing School Building at Plot no. SF-5 in 'G'… — under environmental review, 300 m away
- Proposed Addition Alteration/ Vertical Extension in the Existing School… — environmental approval granted, 350 m away
- Convention, Exhibition Centre and Commercial Complex at Plot No. C – 64, G… — environmental approval granted, 550 m away
- Convention, Exhibition Centre and Commercial Complex at Plot No. C – 64, G… — cleared for impact study, 550 m away
- Corporate Office Building of Edelweiss Rural and Corporate Services Limited on… — environmental approval granted, 550 m away
- Environmental Clearance for proposed "Commercial Building" on plot bearing… — environmental approval granted, 600 m away
- "Slum Rehabilitation Scheme" under reg. 33(11) of DCPR-2034 on plot bearing… — environmental approval granted, 600 m away
- "Slum Rehabilitation Scheme" under reg. 33(11) of DCPR-2034 on plot bearing… — lapsed, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.