Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Apr 2026 |
| Application filed | 22 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | The Malegaon Sahakari Sakhar Karkhana LTD |
| Land area | 164.9 acres (66.7 ha) |
| Project cost | ₹285.3 crore |
| Village / locality | Malegaon Bk. |
| Taluk / tehsil | Baramati |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10733 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 22 Apr 2025 (this page) | Cleared for impact study | 164.9 acres | ₹285.3 crore |
| Early planning filed 27 Jun 2024 | Returned to applicant | 164.9 acres | ₹285.3 crore |
In context
121 applications in Pune since January 2022 are in the same category (Industry): 81 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 164.9 acres, this one is larger than 92% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malegaon Bk., Baramati, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sugarcane Juice/Sugar Syrup/ Molasses Based Distillery Unit From… — returned to applicant, 0 m away
- Expansion of Molasses/Sugarcane Juice/Sugar Syrup Based Distillery Unit From… — lapsed, 50 m away
- Proposal for Use of Forest Land for Underground Water Pipeline — lapsed, 6.8 km away
- Environment clearance for Proposed Construction of Veterinary and Animal… — under environmental review, 7.1 km away
- Proposal for Use of Forest Land for Underground Water Pipeline — lapsed, 7.2 km away
- Diversion of 0.028 Ha for Underground Pvc Water Supply Pipeline for… — lapsed, 7.4 km away
- Diversion of Forest Land for laying underground pipeline under Deulgaon Rasal… — lapsed, 7.4 km away
- Proposal for Use of Forest Land for Underground Water Pipeline — lapsed, 7.6 km away
All 3 The Malegaon Sahakari projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.