Quick answers
What is this project?
Proposed Redevelopment of "Om Shree Geetanjali Nagar CHSL" on Plot bearing CTS no. 1(pt.), 1/A/1(pt.), 1/B/1/A/1 (pt.) & 2/B/1 (pt.) of Village Magathane, R/C Ward, Taluka: Borivali, District: Mumbai Suburban, State: Maharashtra, India is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 2.2 acres.
Who is building it?
The applicant is Lodha Developers Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Nov 2025), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹233 crore and a site of 2.2 acres.
When was it filed?
The application was filed on 6 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Nov 2025 |
| Application filed | 6 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Lodha Developers Limited |
| Use | Residential |
| Land area | 2.2 acres (0.9 ha) |
| Built-up area | 1,01,851 m² (10,96,314 sq ft) |
| Project cost | ₹233 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10881 |
What the filings say
What is planned
Lodha Developers Limited proposes the redevelopment of the "Om Shree Geetanjali Nagar CHSL" in Borivali, Mumbai. The project report describes a residential and commercial complex consisting of multiple wings for rehabilitation and sale components.
The project includes the following building components:
- Sale Building: Comprising Wing A and Wing B, situated above a common podium structure.
- Rehab Building: Comprising Wing C and Wing D.
- AHRR / MHADA Wing: A separate wing dedicated to the Maharashtra Housing and Area Development Authority (MHADA) or Affordable Housing and Rehabilitation (AHRR) requirements.
The layout features a common podium structure with 4 basements and 8 podium levels. The residential entry and exit are planned from Sai Baba Mandir Marg, which is an 18.30-metre wide road.
Layout and design
The site layout includes designated areas for residential wings, driveways, and open spaces. A 9.00-metre wide driveway is planned around the periphery of the buildings to ensure fire tender access and smooth vehicular movement. The design incorporates specific turning radii of 9.00 metres and 12.00-metre wide paved areas in key sections.
Open spaces are distributed across the plot:
- RG-01: A large recreational ground area on the ground level located at the northern end of the plot.
- RG-02: A smaller recreational ground area on the ground level near the rehab wings.
- AOS: An additional open space area adjacent to RG-01.
Water, power and access
The applicant's environmental management plan outlines the resource requirements for both construction and operation phases. During construction, which is expected to last approximately 5 years, sewage generation is estimated at 10 kilolitres per day (KLD) and solid waste at 15 kg/day.
For the operation phase, the water and waste management strategy includes:
- Water Supply: Total sewage generation is estimated at 306 KLD. The project will use treated sewage for flushing (118 KLD) and gardening (7 KLD).
- Sewage Treatment: Three Sewage Treatment Plants (STPs) with a total capacity of 378 KL are proposed to treat waste to a tertiary level.
- Rainwater Harvesting: Six rainwater harvesting tanks with a total capacity of 247 KL will be installed to manage runoff.
- Power: Electricity will be supplemented by solar panels. Energy-saving measures include LED lighting with timer-based controls for external areas, and energy-efficient lifts with Variable Voltage Variable Frequency (VVVF) drives.
- Solid Waste: The project is expected to generate 471 kg/day of biodegradable waste, which will be treated in an Organic Waste Converter (OWC) on-site. Non-biodegradable waste (707 kg/day) will be handed over to authorized recyclers.
Environmental safeguards
During the construction phase, the applicant proposes several mitigation measures to control dust and noise. These include providing barricades along the site periphery, using polymeric dust suppression systems, and installing on-site sensors to monitor PM10 and PM2.5 levels with a 24x7 digital display. Vehicles will be required to have valid Pollution Under Control (PUC) certificates and will undergo wheel washing before exiting the site.
Excavation is expected to generate 47,252 cubic metres of material. Of this, 9,456 cubic metres will be reused on-site for backfilling and levelling, while the remaining 37,796 cubic metres will be disposed of at authorized landfill sites with municipal permission.
For the operation phase, the STPs will be equipped with onsite sensors for daily analysis of outlet parameters. Acoustic enclosures will be provided for Diesel Generator (DG) sets to minimize noise pollution during power failures.
Lodha Redevelopment of Om Shree Geetanjali Nagar CHSL site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is larger than 54% of them.
498 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (13.2 km away).
Other projects nearby
- Proposed redevelopment of "Om Shree Geetanjali Nagar CHSL" on Plot bearing CTS… — withdrawn, 0 m away
- Proposed redevelopment of "Om Shree Geetanjali Nagar CHSL" on Plot bearing CTS… — withdrawn, 0 m away
- Proposed redevelopment of Om Shree Geetanjali Nagar CHSL on Plot bearing CTS… — withdrawn, 0 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — under environmental review, 150 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — under environmental review, 150 m away
- Amendment and Expansion in Environmental Clearance for proposed Redevelopment… — environmental approval granted, 150 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — withdrawn, 200 m away
- Proposed Development on plot bearing C.T.S. No.4/5 to 4/8, 4/10(pt), 4/14,… — cleared for impact study, 200 m away
More from Lodha Developers Limited in Mumbai Suburban
- Residential and commercial development at plot bearing CTS no. 67, 67A, 67/1… — environmental approval granted
- Residential and commercial development at plot bearing CTS no. 67, 67A, 67/1… — under environmental review
- Residential and commercial development at plot bearing CTS no. 67 (pt.), 67A,… — lapsed
- Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S.… — environmental approval granted
- Proposed residential cum commercial development on Plot bearing CTS no 1 of… — environmental approval granted
- Corrigendum in Environmental clearance Proposed Expansion in Residential… — lapsed
68 Lodha (Macrotech Developers) projects in Mumbai
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.