Proposed Residential Development at plot bearing Survey No. 16/3, 16/4, 17/1, 18/0, 19/1A/1, 19/1A/2 of Village- Waishet, Taluka-Alibag, District - Raigad, State: Maharashtra, India by M/s. Fama Properties Private Limited is an approved residential project in Thal, Alibag, Raigarh, Maharashtra. The site covers 7.1 acres.
Who is building it?
The applicant is Fama Properties Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jul 2025), as of 27 Nov 2026.
Where is it?
In Thal, Alibag, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹199.7 crore and a site of 7.1 acres.
When was it filed?
The application was filed on 24 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Jul 2025 |
| Application filed | 24 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Fama Properties Limited |
| Use | Residential |
| Land area | 7.1 acres (2.9 ha) |
| Built-up area | 35,500 m² (3,82,118 sq ft) |
| Project cost | ₹199.7 crore |
| Village / locality | Thal |
| Taluk / tehsil | Alibag |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11029 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.1 acres, this one is larger than 71% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thal, Alibag, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting-up a New 1200 MTPD (DAP BASIS) Complex Fertilizer Plant at existing… — environmental approval granted, 1 km away
- Setting-up a New 1200 MTPD (DAP BASIS) Complex Fertilizer Plant at existing… — environmental approval granted, 1 km away
- Application for Corrigendum in Environmental Clearance of Stone Quarry Project… — environmental approval granted, 1.1 km away
- Construction of Holiday Resort — recommended by coastal authority, 2.4 km away
- Construction of Holiday Resort — withdrawn, 2.4 km away
- 4.50 M. Road Along With a Water Pipeline and Electric Line Etc. in Old S.… — under forest review, 2.4 km away
- Approach Road to Private land — initial checks, 2.5 km away
- Proposed Tourist Home at Kihim, Tal. Alibag, Dist. Raigad, Maharashtra — recommended by coastal authority, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.