What is Developing? Open the mapMap

WithdrawnBuildings & townships · Aurangabad, Maharashtra

Proposed Redevelopment of Bus Port with Commercial facilities on land bearing Survey No. 81, Sector-Town Centre, CIDCO, Chhatrapati Sambhajinagar, for Maharashtra State Road Transport Corporation (MSRTC) Chhatrapati Sambhajinagar Division; Concessionaire- M/s. Kazi Sanghani Bumb Jabinda Infra Pvt. Ltd.

Proposed Redevelopment of Bus Port with Commercial facilities on land bearing Survey No. 81, Sector-Town Centre, CIDCO, Chhatrapati Sambhajinagar, for Maharashtra State Road Transport Corporation (MSRTC) Chhatrapati Sambhajinagar Division; Concessionaire- M/s. Kazi Sanghani Bumb Jabinda Infra Pvt. Ltd is a withdrawn building project in Mukandwadi, Aurangabad, Maharashtra. The site covers 8.1 acres. Its stated project cost is ₹120 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 13 Aug 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Redevelopment of Bus Port with Commercial facilities on land bearing Survey No.…

Project details

StatusWithdrawn
Status since13 Aug 2025
Application filed26 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKazi Sanghani Bumb Jabinda Infra Private Limited
Land area8.1 acres (3.3 ha)
Project cost₹120 crore
Village / localityMukandwadi
Taluk / tehsilAurangabad
DistrictAurangabad
StateMaharashtra
Location fromSite area on record
Our referenceWID-MH-11058

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Aug 2025Environmental approval granted8.1 acres₹120 crore
New project filed 26 Mar 2025 (this page)Withdrawn8.1 acres₹120 crore

In context

91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.1 acres, this one is smaller than 70% of them.

34 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mukandwadi, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.