One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion Project for Manufacturing of DOSS / Esters, Amides and Polyelectrolytes From…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 May 2025 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Spak Orgochem (India) Private Limited |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹7.3 crore |
| Village / locality | Dahbhadgaon |
| Taluk / tehsil | Nashik |
| District | Nashik |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11126 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Oct 2025 | Environmental approval granted | 1 acre | ₹7.3 crore |
| Early planning filed 12 May 2025 (this page) | Cleared for impact study | 1 acre | ₹7.3 crore |
In context
63 applications in Nashik since January 2022 are in the same category (Industry): 43 approved, 11 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 81% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahbhadgaon, Nashik, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion Project for Manufacturing of DOSS / Esters, Amides and… — environmental approval granted, 0 m away
- Proposed Residential Project at Plot bearing S. No. 48 /4/A & 48/4/B,… — lapsed, 1.4 km away
- Proposed Residential Project at Plot bearing S. No. 48 /4/A & 48/4/B,… — returned to applicant, 1.4 km away
- Proposed Residential Project by M/s. Zenith Realty — lapsed, 2.4 km away
- Proposed Residential Project by Zenith Realty — lapsed, 2.4 km away
- Proposed Residential and Commercial Project at S.No. 34/2/A/1/1/2 Anandvalli,… — lapsed, 2.8 km away
- Environment Clearance for Proposed Residential & Commercial construction… — environmental approval granted, 2.9 km away
- "Tree Land"- Residential and Commercial Development by M/s. ABH Developers… — cleared for impact study, 2.9 km away
All 7 Spak Orgochem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.