Quick answers
What is this project?
Application for Amendment in Consent to Operate Under Change in Product Mix With No Increase in Pollution Load With Decrease in Production Capacity in Existing Project As Per Eia Notification 23rd November,2016, 16th January 2020 and 2nd March 2021 is a proposed project in Taloje Panchnad, Panvel, Raigarh, Maharashtra. The site covers 4.8 acres.
Who is building it?
The applicant is Ravi Dyeware.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Taloje Panchnad, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹33.2 crore and a site of 4.8 acres.
When was it filed?
The application was filed on 9 Jul 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Jul 2025 |
| Application filed | 9 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Ravi Dyeware |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹33.2 crore |
| Village / locality | Taloje Panchnad |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11160 |
In context
78 applications in Raigarh since January 2022 are in the same category (Other): 17 approved, 38 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.8 acres, this one is larger than 50% of them.
172 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Taloje Panchnad, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Consented Excipients Viz Poly Glycols (Peg's),… — under environmental review, 300 m away
- Proposed Expansion of Existing Consented Excipients Viz Poly Glycols (Peg's),… — cleared for impact study, 300 m away
- Proposed expansion project for manufacturing of Optical brightening… — environmental approval granted, 350 m away
- Proposed expansion project for manufacturing of Optical brightening… — cleared for impact study, 350 m away
- Proposed project for manufacturing of Pharmaceutical products & Intermediates… — cleared for impact study, 450 m away
- Proposed new project for manufacturing of Pharmaceutical products &… — environmental approval granted, 500 m away
- Proposed new project for manufacturing of Pharmaceutical products &… — returned to applicant, 500 m away
- Proposed new project for manufacturing of Pharmaceutical products &… — cleared for impact study, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.