Project details
| Official title | Proposed Expansion in manufacturing of SS fastener & Threaded bar with Pickling, annealing & Shot blasting activity from 2,67,800 TPA to 3,15,800 TPA, production of Alloy Fasteners 32,000 TPA, expansion of SS Seamless pipes & tubes with pickling activity 15840 TPA to 96400 TPA, 36000 TPA of SS Tubes Fittings & Accessories along with Installation of 2.4 MTPA Stainless Steel Plant (6 X 60 T Induction Furnace, 2X 155 T AOD, 2 X 155 T LF including 2.2 MTPA Hot Rolling Mill & Air Separation unit |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 13 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Viraj Profiles Private Limited |
| Land area | 170.7 acres (69.1 ha) |
| Project cost | ₹6,716.7 crore |
| Village / locality | Mahagaon |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11252 |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 170.7 acres, this one is larger than 96% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahagaon, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — under environmental review, 1.1 km away
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — cleared for impact study, 1.1 km away
- Permission to Use Restored Private Forest Land Construction of Access/Approach… — in-principle approval, conditions pending, 2.4 km away
- RE-DIVERSION OF 2.5515 HA. FOREST LAND FOR SHIFTING OF EXISTING 220 KV BOISAR… — in-principle approval, conditions pending, 2.8 km away
- DIVERSION OF 0.1670 HA. FOREST LAND FOR SHIFTING OF EXISTING 220 KV BOISAR… — in-principle approval, conditions pending, 2.8 km away
- Proposed Revised Approval for Group Housing Scheme at Land Bearing Gut No… — lapsed, 3.4 km away
- Proposed Revised Approval for Group Housing Scheme at Land Bearing Gut No… — cleared for impact study, 3.4 km away
- Proposed Revised Approval for Group Housing Scheme at Land Bearing Gut No… — environmental approval granted, 3.4 km away
More from Viraj Profiles Private Limited in Palghar
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — under environmental review
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — cleared for impact study
- Proposed 2.4 MTPA Stainless Steel Plant (6X60 T Induction Furnace, 3X130 T… — cleared for impact study
All 4 Viraj Profiles projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.