One of 2 filings for this project. The project's main page, with every filing and where each stands: Redevelopment - "Saifee Burhani Upliftment Project"
Project details
| Official title | Redevelopment - "Saifee Burhani Upliftment Project" at Village Masjid Bandar Bhuleshwar Division in C-Ward, Mumbai. |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Jan 2026 |
| Application filed | 20 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Saifee Burhani Upliftment Trust |
| Use | Township |
| Land area | 16.2 acres (6.5 ha) |
| Built-up area | 9,28,437 m² (99,93,603 sq ft) |
| Project cost | ₹4,310 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11274 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Apr 2026 | Environmental approval granted | 16.2 acres | ₹4,310 crore |
| Early planning filed 20 Jan 2026 (this page) | Cleared for impact study | 16.2 acres | ₹4,310 crore |
What the filings say
What is planned
The Saifee Burhani Upliftment Trust is undertaking a large-scale urban redevelopment of the Bhendi Bazaar area in Mumbai. According to the applicant's project report, the project is an Urban Renewal Scheme under Development Control Regulation 33(9), aimed at replacing dilapidated buildings over 100 years old with a modern residential and commercial township. The development is divided into nine sectors across 6.54 hectares (16.16 acres).
The project includes a mix of redevelopment, incentive sale, and reservation components. The residential portion includes 5,603 flats, while the commercial aspect features retail shops, offices, and a community kitchen. Public amenities such as a municipal police chowky, schools, an Imambada, and a multipurpose community hall are also planned.
Building heights vary across the sectors, with several high-rise structures proposed:
- A 61-storey building (two basements, ground, and 61 upper floors).
- Buildings with wings reaching 53 and 54 upper floors.
- A redevelopment building with wings of 36 and 41 upper floors.
- Other structures ranging from 10 to 49 upper floors.
- A municipal primary school building with a basement, ground, and three floors.
As of the latest reports, construction is ongoing. Sector 3 is completely occupied, while Sectors 1, 4, and 6 are partly occupied. The applicant has received partial Occupation Certificates for these sectors from the Brihanmumbai Municipal Corporation (BMC).
Layout and design
The site is organized into nine sectors with a total construction built-up area of 9,28,409.79 square metres. The ground coverage is 38,180.62 square metres, leaving 7,916 square metres for recreation ground area.
Parking is provided through a mix of basements and podium levels. The project plans for 4,590 four-wheeler spaces and 1,265 two-wheeler spaces. The layout is integrated with the existing urban grid, featuring internal roads and connecting bridges between sectors at the second-floor commercial levels.
Water, power and access
The project's fresh water requirement is estimated at 2,362 kilolitres per day (KLD), primarily sourced from the BMC, with an additional 5 KLD from tankers for swimming pool makeup. The total sewage generation is expected to be 3,525 KLD. To manage this, the applicant proposes 10 sewage treatment plants with a combined capacity of 3,700 KL. Treated water (1,294 KLD) will be recycled for flushing and gardening.
Power will be supplied by Brihanmumbai Electric Supply and Transport (BEST) and TATA Power, with a connected load of 93,771 kW. For emergency backup, 11 diesel generator sets with a total capacity of 8,500 kVA will be installed. The project aims for a 20.02% overall energy saving, including a 5.07% saving through solar energy installations.
The site is bounded by major arterial roads:
- East: Ebrahim Rahimtulla Road / J.J. Flyover (35.05 m wide).
- West: Mutton Street Road (18.29 m and 9.14 m wide).
- North: Maulana Shaukatali Road (36.57 m wide).
- South: Sardar Vallabhbhai Patel Road (29.26 m wide).
Environmental safeguards
The applicant plans to plant 770 trees of various varieties, of which 67 have already been planted. For solid waste management, the project will generate approximately 7,534 kg/day of biodegradable waste, which will be treated in on-site organic waste converters to produce manure. Non-biodegradable waste (5,023 kg/day) will be handed over to the BMC.
Storm water management includes a network designed for a discharge capacity of 1.82 cubic metres per second. Rainwater harvesting will be implemented through eight tanks with a total capacity of 1,100 KL. Dust suppression systems and foggers are proposed for use during the remaining construction phases.
Timeline
The redevelopment began in early 2016. The total construction period for the entire project, including both the redevelopment and incentive sale portions, is estimated to span 16 to 18 years. The applicant expects the remaining portion of the project to take approximately eight years to complete.
Redevelopment - Saifee Burhani Upliftment Project site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.2 acres, this one is larger than 86% of them.
378 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Redevelopment - "Saifee Burhani Upliftment Project" — environmental approval granted, 0 m away
- Redevelopment - "Saifee Burhani Upliftment Project" at Bhuleshwar Division in… — environmental approval granted, 0 m away
- Redevelopment - "Saifee Burhani Upliftment Project" at Bhuleshwar Division in… — cleared for impact study, 0 m away
- Proposed joint redevelopment project by M/s. P. Builders, named "Venus… — environmental approval granted, 400 m away
- Proposed underground road connectivity from Eastern Freeway-Orange Gate to… — coastal clearance granted, 450 m away
- Proposed Redevelopment of Property Bearing C.S No 788 & 787 Of Byculla… — environmental approval granted, 450 m away
- Application for EC for proposed Expansion in Residential cum Commercial… — environmental approval granted, 500 m away
- Proposed Redevelopment Project under section 33(7) & 33(22) of DCPR 2034 at… — environmental approval granted, 500 m away
More from Saifee Burhani Upliftment Trust in Mumbai
- Redevelopment - "Saifee Burhani Upliftment Project" at Bhuleshwar Division in… — environmental approval granted
- Redevelopment - "Saifee Burhani Upliftment Project" at Bhuleshwar Division in… — cleared for impact study
All 4 Saifee Burhani Upliftment projects across India