Cleared for impact studyBuildings & townships · Mumbai, Maharashtra

Redevelopment - "Saifee Burhani Upliftment Project"

Redevelopment - "Saifee Burhani Upliftment Project" is a proposed township project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 16.2 acres. Its stated project cost is ₹4,310 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 Jan 2026).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Redevelopment - "Saifee Burhani Upliftment Project"

Project details

Official titleRedevelopment - "Saifee Burhani Upliftment Project" at Village Masjid Bandar Bhuleshwar Division in C-Ward, Mumbai.
StatusCleared for impact study
Status since27 Jan 2026
Application filed20 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantSaifee Burhani Upliftment Trust
UseTownship
Land area16.2 acres (6.5 ha)
Built-up area9,28,437 m² (99,93,603 sq ft)
Project cost₹4,310 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-11274

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 7 Apr 2026Environmental approval granted16.2 acres₹4,310 crore
Early planning filed 20 Jan 2026 (this page)Cleared for impact study16.2 acres₹4,310 crore

What the filings say

What is planned

The Saifee Burhani Upliftment Trust is undertaking a large-scale urban redevelopment of the Bhendi Bazaar area in Mumbai. According to the applicant's project report, the project is an Urban Renewal Scheme under Development Control Regulation 33(9), aimed at replacing dilapidated buildings over 100 years old with a modern residential and commercial township. The development is divided into nine sectors across 6.54 hectares (16.16 acres).

The project includes a mix of redevelopment, incentive sale, and reservation components. The residential portion includes 5,603 flats, while the commercial aspect features retail shops, offices, and a community kitchen. Public amenities such as a municipal police chowky, schools, an Imambada, and a multipurpose community hall are also planned.

Building heights vary across the sectors, with several high-rise structures proposed:

As of the latest reports, construction is ongoing. Sector 3 is completely occupied, while Sectors 1, 4, and 6 are partly occupied. The applicant has received partial Occupation Certificates for these sectors from the Brihanmumbai Municipal Corporation (BMC).

Layout and design

The site is organized into nine sectors with a total construction built-up area of 9,28,409.79 square metres. The ground coverage is 38,180.62 square metres, leaving 7,916 square metres for recreation ground area.

Parking is provided through a mix of basements and podium levels. The project plans for 4,590 four-wheeler spaces and 1,265 two-wheeler spaces. The layout is integrated with the existing urban grid, featuring internal roads and connecting bridges between sectors at the second-floor commercial levels.

Water, power and access

The project's fresh water requirement is estimated at 2,362 kilolitres per day (KLD), primarily sourced from the BMC, with an additional 5 KLD from tankers for swimming pool makeup. The total sewage generation is expected to be 3,525 KLD. To manage this, the applicant proposes 10 sewage treatment plants with a combined capacity of 3,700 KL. Treated water (1,294 KLD) will be recycled for flushing and gardening.

Power will be supplied by Brihanmumbai Electric Supply and Transport (BEST) and TATA Power, with a connected load of 93,771 kW. For emergency backup, 11 diesel generator sets with a total capacity of 8,500 kVA will be installed. The project aims for a 20.02% overall energy saving, including a 5.07% saving through solar energy installations.

The site is bounded by major arterial roads:

Environmental safeguards

The applicant plans to plant 770 trees of various varieties, of which 67 have already been planted. For solid waste management, the project will generate approximately 7,534 kg/day of biodegradable waste, which will be treated in on-site organic waste converters to produce manure. Non-biodegradable waste (5,023 kg/day) will be handed over to the BMC.

Storm water management includes a network designed for a discharge capacity of 1.82 cubic metres per second. Rainwater harvesting will be implemented through eight tanks with a total capacity of 1,100 KL. Dust suppression systems and foggers are proposed for use during the remaining construction phases.

Timeline

The redevelopment began in early 2016. The total construction period for the entire project, including both the redevelopment and incentive sale portions, is estimated to span 16 to 18 years. The applicant expects the remaining portion of the project to take approximately eight years to complete.

Redevelopment - Saifee Burhani Upliftment Project site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Redevelopment - Saifee Burhani Upliftment Project: Layout plan: sectors, internal roads and building footprints (preview)🔒 Sign in free to see it
Layout plan: sectors, internal roads and building footprints
Redevelopment - Saifee Burhani Upliftment Project: Location map: surrounding roads and J.J. Flyover (preview)🔒 Sign in free to see it
Location map: surrounding roads and J.J. Flyover
Redevelopment - Saifee Burhani Upliftment Project: Study area: 10 km radius around the project site (preview)🔒 Sign in free to see it
Study area: 10 km radius around the project site

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.2 acres, this one is larger than 86% of them.

378 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Saifee Burhani Upliftment Trust in Mumbai

All 4 Saifee Burhani Upliftment projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.