Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 May 2026 |
| Application filed | 2 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Clean Fino-Chem Limited |
| Land area | 32.8 acres (13.3 ha) |
| Project cost | ₹11 crore |
| Village / locality | Pandharwadi |
| Taluk / tehsil | Daund |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11286 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Oct 2026 | Under environmental review | 32.8 acres | ₹11 crore |
| Early planning filed 2 May 2026 (this page) | Cleared for impact study | 32.8 acres | ₹11 crore |
In context
121 applications in Pune since January 2022 are in the same category (Industry): 81 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 32.8 acres, this one is larger than 75% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pandharwadi, Daund, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project for manufacturing of Synthetic Organic Chemicals at… — under environmental review, 0 m away
- New Project for manufacturing of Synthetic Organic Chemicals at Plot No. D-2,… — environmental approval granted, 0 m away
- Proposed Expansion in Existing Environment Clearance of Project for… — environmental approval granted, 300 m away
- Proposed Expansion in Existing Environment Clearance of Project for… — cleared for impact study, 300 m away
- Proposed Expansion in Existing Environmental Clearance of project for… — not approved, 300 m away
- Amendment in Existing Environmental Clearance for proposed expansion project… — not approved, 300 m away
- Application for Amendment in Consent to Operate With a Change in Product Mix… — initial checks, 500 m away
- Proposed API & Intermediate Manufacturing Industry by Lavender Laboratories… — environmental approval granted, 600 m away
More from Clean Fino-Chem Limited in Pune
- New Project for manufacturing of Synthetic Organic Chemicals at Plot No. D-2,… — environmental approval granted
All 3 Clean Fino-Chem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.