Quick answers
What is this project?
Environmental clearance for proposed expansion of construction project (SRA scheme) is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 9 acres.
Who is building it?
The applicant is Mpire Reality Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹914.2 crore and a site of 9 acres.
When was it filed?
The application was filed on 17 Apr 2026.
Project details
| Official title | Environmental clearance for proposed expansion of construction project (SRA scheme) at CTS No. 620(pt) of village Malad at Goregaon-Mulund Link Road, Mumbai by M/s. Mpire Realty Ltd Formerly known as M/s. Ravi Ashish Land Developers Ltd |
|---|---|
| Status | Cleared for impact study |
| Status since | 4 May 2026 |
| Application filed | 17 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Mpire Reality Limited |
| Use | Residential |
| Land area | 9 acres (3.6 ha) |
| Built-up area | 2,05,637 m² (22,13,456 sq ft) |
| Project cost | ₹914.2 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11345 |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9 acres, this one is larger than 83% of them.
471 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (8.6 km away).
Other projects nearby
- Proposed expansion of construction project (SRA scheme) by M/s. Ravi Ashish… — lapsed, 0 m away
- M/S D.G.S Township PVT. LTD. — environmental approval granted, 100 m away
- Slum Rehabilitation Scheme "Shree Wagheshwari SRA CHS (Ltd.)" — withdrawn, 150 m away
- Slum Rehabilitation Scheme "Shree Wagheshwari SRA CHS (Ltd.)" — environmental approval granted, 150 m away
- Slum Rehabilitation Scheme "Shree Wagheshwari SRA CHS (Ltd.)" — withdrawn, 150 m away
- Expansion in environment clearance of proposed S.R. Scheme under Reg. 33(10)… — environmental approval granted, 200 m away
- Expansion in environment clearance of proposed S.R. Scheme under Reg. 33(10)… — cleared for impact study, 200 m away
- Proposed S.R. scheme on property bearing CTS no. 612(Pt.), 613 (Pt.), 614,… — cleared for impact study, 200 m away
More from Mpire Reality Limited in Mumbai Suburban
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.