Quick answers
What is this project?
Proposed Expansion for Manufacturing of Specialty Chemicals for Oil Well Drilling Applications is a proposed industrial project in Dheku, Khalapur, Raigarh, Maharashtra. The site covers 7.7 acres.
Who is building it?
The applicant is Gumpro Drilling Fluids PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dheku, Khalapur, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹61.6 crore and a site of 7.7 acres.
When was it filed?
The application was filed on 29 Sept 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion for Manufacturing of Specialty Chemicals for Oil Well Drilling…
Project details
| Official title | Proposed Expansion for Manufacturing of Specialty Chemicals for Oil Well Drilling Applications at Village Dheku, Taluka Khalapur, District Raigad – 410203, Maharashtra |
|---|---|
| Status | Under environmental review |
| Status since | 15 Oct 2026 |
| Application filed | 29 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Gumpro Drilling Fluids PVT LTD |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹61.6 crore |
| Village / locality | Dheku |
| Taluk / tehsil | Khalapur |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11638 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 29 Sept 2026 (this page) | Under environmental review | 7.7 acres | ₹61.6 crore |
| Early planning filed 9 Jul 2025 | Cleared for impact study | 7.7 acres | ₹61.6 crore |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.7 acres, this one is larger than 61% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dheku, Khalapur, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion for Manufacturing of Specialty Chemicals for Oil Well… — cleared for impact study, 0 m away
- Manufacturing of Synthetic Organic Chemicals Unit by M/s. Prasol Chemicals… — environmental approval granted, 550 m away
- The Diversion of Forest Land of 0.0434 Ha. for Laying of Gas Pipeline From… — more information requested, 1 km away
- Proposed Expansion of M/s. Silicone International Products — cleared for impact study, 1.8 km away
- Expansion from 150MT/M to 750 MT/M of Silicone Fluid — lapsed, 1.8 km away
- Expansion from 150MT/M to 750 MT/M of Silicone Fluid — returned to applicant, 1.8 km away
- Expansion from 150MT/M to 750 MT/M of Silicone Fluid — cleared for impact study, 1.8 km away
- Proposed Expansion Project for Manufacturing Silicone Fluid at Survey No.… — withdrawn, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.