Quick answers
What is this project?
Proposed Project under AHP-PPP model of PMAY at Shrigonda, Ahilyanagar by M/s Icon Infra is a proposed building project in Shrigonda, Ahmadnagar, Maharashtra. The site covers 12 acres.
Who is building it?
The applicant is Icon Infra.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Shrigonda, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹60.3 crore and a site of 12 acres.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 Jul 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Icon Infra |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹60.3 crore |
| Village / locality | Shrigonda |
| Taluk / tehsil | Shrigonda |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11828 |
In context
74 applications in Ahmadnagar since January 2022 are in the same category (Buildings & townships): 16 approved, 51 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12 acres, this one is larger than 56% of them.
Where it is
Shrigonda, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance of 7500 TCD sugar unit, 40 MW Cogeneration… — under environmental review, 6.8 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — withdrawn, 6.8 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — environmental approval granted, 6.8 km away
- Name change in Environmental Clearance of sugar unit 7500 TCD, 40 MW… — under environmental review, 6.8 km away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) at… — returned to applicant, 6.9 km away
- Indramohini Stone Works LLP, Shri. Mahesh Hanumant Kothimbire, Shri.… — environmental approval granted, 9.6 km away
- Piped Water Supply Scheme for village Takali Kadewalit Taluka Shrigonda Dist.… — lapsed, 10.9 km away
- Expansion of Sugar Factory from 4800 TCD to 7500 TCD & Molasses based… — environmental approval granted, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.