One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Synthetic Organic Chemicals Manufacturing Plant located at Plot No A 61, MIDC…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mayuresh Nathasaheb Kolekar |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹9.5 crore |
| Village / locality | Bombalewadi |
| Taluk / tehsil | Kadegaon |
| District | Sangli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11891 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Aug 2026 | Environmental approval granted | 1.3 acres | ₹9.5 crore |
| Early planning filed 31 Mar 2026 (this page) | Under environmental review | 1.3 acres | ₹9.5 crore |
In context
44 applications in Sangli since January 2022 are in the same category (Industry): 30 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.3 acres, this one is smaller than 93% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bombalewadi, Kadegaon, Sangli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals Manufacturing Plant located at Plot No A… — environmental approval granted, 0 m away
- M/s. SMS Watergrace Enviroprotect Private Limited, Proposed New Project of… — under environmental review, 650 m away
- M/s. SMS Watergrace Enviroprotect Private Limited, Proposed New Project of… — under environmental review, 650 m away
- M/s. SMS WATERGRACE ENVIROPROTECT PRIVATE LIMITED Proposed New Project of… — lapsed, 650 m away
- New Project for the Manufacturing of Synthetic Organic Chemicals by M/s. Acme… — cleared for impact study, 700 m away
- Proposed Manufacturing of Synthetic Organic Chemicals by M/s. Sahyadri… — more information requested, 900 m away
- Industrial project by M/s. Sahyadri Industries — under environmental review, 950 m away
- Environmental Clearance application for Stone Quarry Proposal of Navnath… — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.