Quick answers
What is this project?
Proposed Residential & Commercial Project at S.No. 64, 64/ 1 to 36 Jay Bhavani Mata Road, Amboli, Andheri (W), Mumbai - 400 058 by M/s. Rolland Spaces Pvt Ltd is an approved mixed-use project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.1 acres.
Who is building it?
The applicant is Rolland Spaces Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Aug 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹225 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 28 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Aug 2026 |
| Application filed | 28 May 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Rolland Spaces Private Limited |
| Use | Mixed use |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹225 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11938 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 28 May 2026 (this page) | Environmental approval granted | 1.1 acres | ₹225 crore |
| New project filed 14 Aug 2025 | Environmental approval granted | 1.1 acres | ₹225 crore |
What the filings say
What is planned
The project by Rolland Spaces Private Limited is a Slum Rehabilitation Authority (SRA) redevelopment scheme involving residential and commercial components. The applicant proposes a total built-up area of 39,975.91 square metres on a plot of 0.45 hectares (1.12 acres).
The layout plan indicates the project will consist of three wings (Wing-A, Wing-B, and Wing-C). The development includes a rehab building and a sale building. The rehab component is designed to accommodate 253 residential tenements and 17 commercial units, along with various community facilities. The sale building is planned to provide 284 residential tenements and 2 commercial units.
Project Components
| Item | Detail |
|---|---|
| Total Plot Area | 4,532.50 sq.mt. |
| Net Plot Area | 3,563.14 sq.mt. |
| Total Built-up Area | 39,975.91 sq.mt. |
| Rehab Residential Units | 253 |
| Sale Residential Units | 284 |
| Total Residential Units | 537 |
| Total Commercial Units | 19 |
| Community Facilities | Balwadi, Welfare Centre, Society Office, Library, Yuva Centre, Community Hall |
Layout and design
The ground level is planned to feature several commercial shops, entrance lobbies for the different wings, and a fitness centre. The design incorporates a 12.2-metre wide existing Development Plan (DP) road and a 12.2-metre wide proposed DP road. Internal access is provided via 4.5-metre and 6-metre wide driveways.
Parking is planned using stilt parking areas and pit-plus-stack parking systems. The layout includes dedicated spaces for an electrical substation, meter rooms, and a DG (Diesel Generator) set room. A total of 293.10 square metres is proposed for recreational ground (RG) area.
Land and surroundings
The project is located at Jay Bhavani Mata Road in Amboli, Andheri (West). According to a government visit report from November 2025, the site was occupied by existing slums. At that time, demolition of the slums and construction work had not yet started. The site is situated in a residential zone (R-Zone).
Water, power and access
Water for the project is expected to be sourced from the Municipal Corporation of Greater Mumbai (MCGM). The applicant's environmental management plan specifies the use of tanker water during the construction phase.
Infrastructure for water management includes:
- A sewage treatment plant (STP) to be located at the second basement level.
- An organic waste converter (OWC) room for solid waste processing.
- A rainwater harvesting system, which the environmental clearance conditions specify must be relocated from its originally proposed position below the DP road.
- Domestic water storage tanks, which must maintain a minimum 6-metre distance from the STP.
Environmental safeguards
During construction, the applicant proposes to use barricading sheets, cover trucks carrying raw materials, and sprinkle water to suppress dust. Noise mitigation measures include restricting work to daytime and providing earplugs for workers.
For the operation phase, the plan includes:
- Segregation of solid waste at source into biodegradable and non-biodegradable streams.
- Processing biodegradable waste in an organic waste converter to produce manure for gardening.
- Use of CPCB-approved low-sulphur fuel DG sets with acoustic enclosures.
- Tree plantation to act as a noise barrier and improve vegetation cover.
- Use of water-efficient appliances and treated sewage for non-potable purposes like gardening.
Rolland Spaces Residential & Commercial site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 70% of them.
522 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (11 km away).
Other projects nearby
- Proposed Residential & Commercial Project at S.No. 64, 64/ 1 to 36 Jay Bhavani… — environmental approval granted, 0 m away
- Proposed S. R. Scheme U/Regulation 33(11) of DCPR 2034 on property bearing… — withdrawn, 500 m away
- Proposed S. R. Scheme U/Regulation 33(11) of DCPR 2034 on property bearing… — environmental approval granted, 500 m away
- Proposed Slum Rehabilitation Scheme under Reg. 33(10) and Reg.30 of DCPR 2034… — environmental approval granted, 500 m away
- Proposed Building and Construction project at CTS No.68/A/1 & 68/A/2 — environmental approval granted, 550 m away
- Proposed Building and Construction project at CTS No.68/A/1 & 68/A/2 — environmental approval granted, 550 m away
- Building project by M/S. Fiona Realty Private Limited (formerly known as… — environmental approval granted, 550 m away
- Proposed Redevelopment project at Ambivali, Andheri, Mumbai Suburban,… — lapsed, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.