Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2026 |
| Application filed | 4 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Swastik Realtors |
| Use | Mixed use |
| Land area | 2.7 acres (1.1 ha) |
| Built-up area | 37,868 m² (4,07,607 sq ft) |
| Project cost | ₹96.4 crore |
| Village / locality | Kalyan Dombivali Muncipal Corporation |
| Taluk / tehsil | Kalyan |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11979 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Apr 2026 (this page) | Environmental approval granted | 2.7 acres | ₹96.4 crore |
| Expansion filed 18 Sept 2025 | Environmental approval granted | 2.7 acres | ₹96.4 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.7 acres, this one is smaller than 62% of them.
175 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalyan Dombivali Muncipal Corporation, Kalyan, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Proposed Residential cum commercial Building on Land bearing… — environmental approval granted, 0 m away
- Expansion of Proposed Residential Buildings, Amakin Mohammediyah Complex PHASE… — environmental approval granted, 750 m away
- Proposed Residential Project with Shopline at S.No. 69-2/1 (127-2/1) & 28-3/1… — environmental approval granted, 800 m away
- Proposed Expansion and Amendment of "Mangesh Dazzle II" Residential cum… — environmental approval granted, 850 m away
- Proposed Expansion and Amendment of "Mangesh Dazzle II" Residential cum… — lapsed, 850 m away
- "New project for Manufacturing of API Intermediates having capacity of 53.3… — environmental approval granted, 950 m away
- "New project for Manufacturing of API Intermediates having capacity of 53.3… — cleared for impact study, 950 m away
- Amendment of "Balaji Sarvoday": Proposed Residential Project at Plot Bearing… — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.