Proposed Slum Rehabilitation Scheme under Reg. 33(10) of DCPR 2034 on plot bearing C.T.S No. 61(pt.), 61 / 192 to 420 of Village-Majas - 3, Taluka - Andheri, Majaswadi, K / East Ward, Jogeshwari - East, Mumbai - 400 060. For "Shree Ganesh Heramb SRA CHS (prop)" by M/s Malkani Realtors private limited is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans 4 towers of up to 23 floors on 1.9 acres.
Who is building it?
The applicant is Malkani Realtors Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Nov 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹280 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 18 Sept 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Malkani Realtors Private Limited |
| Use | Residential |
| Towers | 4 |
| Floors (tallest) | 23 |
| Height | 68 m |
| Land area | 1.9 acres (0.8 ha) |
| Built-up area | 75,803 m² (8,15,936 sq ft) |
| Project cost | ₹280 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12250 |
What the filings say
What is planned
M/s Malkani Realtors Private Limited is proposing a Slum Rehabilitation Scheme under Regulation 33(10) of the Development Control and Promotion Regulations (DCPR) 2034. The project, designated for the "Shree Ganesh Heramb SRA CHS (prop)", involves the redevelopment of a slum area on a plot of 0.78 hectares (1.93 acres) in Jogeshwari East, Mumbai.
The development consists of multiple building components categorized into rehabilitation and sale wings. According to the layout plans, the project includes:
- Rehab Building 03: A dedicated structure for the rehabilitation of existing slum dwellers.
- Sale Buildings 01, 02, and 04: Residential structures intended for market sale.
The project is classified under Category B2 of the Environmental Impact Assessment (EIA) Notification 2006. The applicant's project report indicates that the scheme will provide improved physical and social infrastructure, including commercial components that are expected to generate local employment opportunities.
Layout and design
The master plan layout shows a configuration of buildings arranged around internal access roads. A proposed 18.30-metre wide road serves as the primary access route through the site. The ground floor layout features a central open space and a designated area for a nala (drainage channel) passing through the property. The design incorporates specific rooms for solid waste storage and treatment, as well as space for a Sewage Treatment Plant (STP) and Organic Waste Converter (OWC).
Water, power and access
According to the water balance chart, the total water requirement for the project is 480 kilolitres per day (KLD). The Municipal Corporation of Greater Mumbai (MCGM) will supply 317 KLD of fresh water for domestic use. The remaining 163 KLD will be met through recycled water from the on-site STP for flushing and landscape irrigation (4 KLD).
The project is expected to generate 416 KLD of sewage. An STP with a capacity of 470 KLD, using Moving Bed Biofilm Reactor (MBBR) technology, is proposed to treat this waste. The system will produce 374 KLD of treated water, of which 167 KLD will be recycled and 207 KLD will be discharged into the municipal sewer. Sludge generation is estimated at 7 kg per day.
Power will be sourced from the local utility, with Diesel Generator (DG) sets provided for emergency backup. Access to the site is supported by proximity to the Western Express Highway and the Mumbai Metro.
Environmental safeguards
The applicant has proposed several mitigation measures to manage environmental impacts:
- Waste Management: Segregated biodegradable waste will be treated in an OWC to produce manure for landscaping. Non-biodegradable and e-waste will be handed over to authorized recyclers. Hazardous waste, such as empty paint containers from construction, will be returned to vendors.
- Air and Noise: The construction site will be barricaded with GI sheets to contain dust and noise. Water sprinkling will be used on internal roads. DG sets will be equipped with acoustic enclosures and stacks of heights compliant with Central Pollution Control Board (CPCB) norms.
- Water Management: Rainwater harvesting tanks are planned to collect terrace runoff. Storm water drains will feature silt, oil, and grease traps to prevent contamination of external municipal drains.
- Green Belt: A three-tier green belt development plan is proposed, using indigenous and air-pollution-abating species like Mango, Ashoka, and Pongamia.
Key Figures
| Item | Detail |
|---|---|
| Total Plot Area | 7,794.60 sq.mt. |
| Net Plot Area | 7,014.60 sq.mt. |
| Road Setback Area | 780.00 sq.mt. |
| Total Water Requirement | 480 KLD |
| Fresh Water Demand | 317 KLD |
| STP Capacity | 470 KLD |
| Sewage Generation | 416 KLD |
| Sludge Generation | 7 kg/day |
Malkani Realtors Slum Rehabilitation Scheme Under Reg. 3310 of DCPR 2034 site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.9 acres, this one is larger than 50% of them.
578 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (9.2 km away).
Other projects nearby
- Proposed expansion in residential development at plot bearing CTS no. 33A, 62… — environmental approval granted, 150 m away
- Proposed Expansion of S.R. scheme under regulation 33(10) & 30 of DCPR on plot… — environmental approval granted, 150 m away
- Environmental Clearance For S.R. Scheme Under Reg.33(10) OF DCPR-2034 for… — environmental approval granted, 200 m away
- Proposed S.R. Scheme U/Reg. 33(10) of DCPR 2034 on Property Bearing CTS No.… — environmental approval granted, 200 m away
- Proposed S.R. Scheme U/Reg. 33(10) of DCPR 2034 on Property Bearing CTS No.… — withdrawn, 200 m away
- Proposed S.R. Scheme U/Reg. 33(10) of DCPR 2034 on Property Bearing CTS No.… — withdrawn, 200 m away
- Proposed expansion of SR scheme under Reg. 33(10) of DCPR 2034 on plot bearing… — environmental approval granted, 250 m away
- Proposed expansion of SR scheme under Reg. 33(10) of DCPR 2034 on plot bearing… — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.