Environmental approval grantedBuildings & townships · Mumbai, Maharashtra

Proposed Cluster Redevelopment Scheme (CDS) under Reg 33(9) for plot bearing CS no. 1/89, 2/89 of Salt Pan Division & CS no. 2/12(pt.), 5 (Pt) and 12 (Pt) of Sion Division located at GTB Nagar, Sion Koliwada, F/N Ward by MHADB through a Construction and Development Agreement by appointment of Construction and Development Agency (C&DA) to M/s Keymidtown Developers Pvt Ltd

Proposed Cluster Redevelopment Scheme (CDS) under Reg 33(9) for plot bearing CS no. 1/89, 2/89 of Salt Pan Division & CS no. 2/12(pt.), 5 (Pt) and 12 (Pt) of Sion Division located at GTB Nagar, Sion Koliwada, F/N Ward by MHADB through a Construction and Development Agreement by appointment of Construction and Development Agency (C&DA) to M/s Keymidtown Developers Pvt Ltd is an approved township project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 11.6 acres. Its stated project cost is ₹2,600 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Jul 2026).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since9 Jul 2026
Application filed27 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKeymidtown Developers Private Limited
UseTownship
Land area11.6 acres (4.7 ha)
Built-up area7,66,216 m² (82,47,472 sq ft)
Plot area46,790 m² (5,03,643 sq ft)
Project cost₹2,600 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-12429

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 May 2026 (this page)Environmental approval granted11.6 acres₹2,600 crore
Early planning filed 21 May 2026Under environmental review11.6 acres₹2,600 crore

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.6 acres, this one is larger than 83% of them.

234 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.