Quick answers
What is this project?
Proposed Expansion of DG set Manufacturing unit at Plot no. B-3/1, MIDC Phaltan, Tal. Phaltan, Dist. Satara 415523 by M/s. Cummins Technologies India Private Limited under 8(a) Building & Construction project B2 category is an approved industrial building project in Nandal, Phaltan, Satara, Maharashtra. The site covers 39.5 acres.
Who is building it?
The applicant is Cummins Technologies India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Oct 2026), as of 27 Nov 2026.
Where is it?
In Nandal, Phaltan, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹1,150 crore and a site of 39.5 acres.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Cummins Technologies India Private Limited |
| Use | Industrial |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹1,150 crore |
| Village / locality | Nandal |
| Taluk / tehsil | Phaltan |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12488 |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 39.5 acres, this one is larger than 65% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandal, Phaltan, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Shed Project at Plot no. C-1, Phaltan Industrial Area,… — initial checks, 450 m away
- Proposed Expansion of Power Generation Business Unit by M/s. Cummins India… — under environmental review, 450 m away
- New Construction Project, "Cummins Power Solutions India Private Limited -… — environmental approval granted, 650 m away
- Proposed Project at Phaltan by M/s ViData PowerTech Ltd — under environmental review, 700 m away
- Building project by Cummins India Limited — lapsed, 700 m away
- Building project by Cummins India Limited — environmental approval granted, 700 m away
- Proposed Warehouse/Storage Project — environmental approval granted, 4.4 km away
- Environmental Clearance for Stone Quarry Project (Area 1.00 Ha) (Private Land)… — lapsed, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.