500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd

500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd is a lapsed industrial project in Yadavpalli, Chamorshi, Gadchiroli, Maharashtra. The site covers 215 acres. Its stated project cost is ₹24,897.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 Nov 2026).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd is a lapsed industrial project in Yadavpalli, Chamorshi, Gadchiroli, Maharashtra. The site covers 215 acres.

Who is building it?

The applicant is Vajra Bharat Steel Private Limited.

Has it been approved?

No. The application was lapsed on 1 Nov 2026, so it is no longer under consideration.

Where is it?

In Yadavpalli, Chamorshi, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹24,897.8 crore and a site of 215 acres.

When was it filed?

The application was filed on 28 Sept 2026.

Project details

Official titleInstallation of 500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd.
StatusLapsed
Status since1 Nov 2026
Application filed28 Sept 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantVajra Bharat Steel Private Limited
Land area215 acres (87 ha)
Project cost₹24,897.8 crore
Village / localityYadavpalli
Taluk / tehsilChamorshi
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-12661

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 215 acres, this one is smaller than 67% of them.

Where it is

Yadavpalli, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.