Quick answers
What is this project?
500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd is a lapsed industrial project in Yadavpalli, Chamorshi, Gadchiroli, Maharashtra. The site covers 215 acres.
Who is building it?
The applicant is Vajra Bharat Steel Private Limited.
Has it been approved?
No. The application was lapsed on 1 Nov 2026, so it is no longer under consideration.
Where is it?
In Yadavpalli, Chamorshi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹24,897.8 crore and a site of 215 acres.
When was it filed?
The application was filed on 28 Sept 2026.
Project details
| Official title | Installation of 500,000 TPA Steel Plant for the production of 200,000 TPA TMT bars and 300,000 TPA Structural sections through coal based direct reduced iron (DRI) EAF-LF-CCM route including CPP of 105 MW and Coal Washery of 0.6 Mtpa at Kh. No.:147 to 150, 153, 154/1 to 155, 176 to 184, 218, 219 of Village Jairampur; Kh. No.: 1 to 9, 15 to 18 of Village Bamanidev and Kh. No.: 20,21,22 of Vill. Yadavpalli, Th. Chamorshi, Dist. Gadchiroli, Maharashtra by Vajra Bharat Steel Pvt. Ltd. |
|---|---|
| Status | Lapsed |
| Status since | 1 Nov 2026 |
| Application filed | 28 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vajra Bharat Steel Private Limited |
| Land area | 215 acres (87 ha) |
| Project cost | ₹24,897.8 crore |
| Village / locality | Yadavpalli |
| Taluk / tehsil | Chamorshi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12661 |
In context
30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 215 acres, this one is smaller than 67% of them.
Where it is
Yadavpalli, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Steel Plant of 6.0 million TPA (Finished Steel) with 1420… — under environmental review, 29.2 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 31.4 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 31.4 km away
- Transfer of EC of Mohurli Ghat. sand ghat on Wainganga River Tq. Chamorshi… — environmental approval granted, 31.6 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 31.6 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 32.1 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 32.1 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 32.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.