Quick answers
What is this project?
Proposed Expansion of Existing Manufacturing Unit of Synthetic Organic Chemicals (Pharmaceuticals and API Products) by M/s. Cipla Limited (Unit II) is a proposed industrial project in Kaire, Khalapur, Raigarh, Maharashtra. The site covers 8.5 acres.
Who is building it?
The applicant is M/S-Cipla Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Nov 2026), as of 27 Nov 2026.
Where is it?
In Kaire, Khalapur, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹72.9 crore and a site of 8.5 acres.
When was it filed?
The application was filed on 11 Oct 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 11 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S-Cipla Limited |
| Land area | 8.5 acres (3.5 ha) |
| Project cost | ₹72.9 crore |
| Village / locality | Kaire |
| Taluk / tehsil | Khalapur |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12774 |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.5 acres, this one is larger than 65% of them.
50 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaire, Khalapur, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by M/s. Cipla Ltd — initial checks, 0 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — initial checks, 100 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — environmental approval granted, 100 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — returned to applicant, 100 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — returned to applicant, 100 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — cleared for impact study, 100 m away
- New project (Greenfield) for manufacturing imaging chemicals of capacity 134… — lapsed, 100 m away
- Increase in production capacity — initial checks, 450 m away
More from M/S-Cipla Limited in Raigarh
- Project by M/s. Cipla Ltd — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.