Quick answers
What is this project?
Application for Amendment & Expansion in EC for proposed Area Development Project (Eco Tourism & Horticulture) is an approved building project in Tareghar, Roha, Raigarh, Maharashtra. The site covers 378.7 acres.
Who is building it?
The applicant is Kelzai Eco Reserves Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Sept 2026), as of 27 Nov 2026.
Where is it?
In Tareghar, Roha, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹450 crore and a site of 378.7 acres.
When was it filed?
The application was filed on 2 Feb 2026.
Project details
| Official title | Application for Amendment & Expansion in EC for proposed Area Development Project (Eco Tourism & Horticulture) at village Tareghar, Taluka Roha, Dist. Raigad Maharashtra by M/s. Kelzai Eco Reserves Pvt Ltd. (Formerly known as M/s. Yashomala Farming and Tourism Pvt Ltd.) |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Sept 2026 |
| Application filed | 2 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Kelzai Eco Reserves Private Limited |
| Use | Other |
| Land area | 378.7 acres (153.3 ha) |
| Built-up area | 15,32,518 m² (1,64,95,871 sq ft) |
| Plot area | 15,32,518 m² (1,64,95,871 sq ft) |
| Project cost | ₹450 crore |
| Village / locality | Tareghar |
| Taluk / tehsil | Roha |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13276 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 2 Feb 2026 (this page) | Environmental approval granted | 378.7 acres | ₹450 crore |
| Early planning filed 1 Oct 2025 | Cleared for impact study | 378.7 acres | ₹450 crore |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 378.7 acres, this one is larger than 98% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tareghar, Roha, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Amendment & Expansion in EC for proposed Area Development… — cleared for impact study, 0 m away
- Construction of Sewage Treatment Plant (STP) At Roha Municipal Council — lapsed, 4.1 km away
- CRZ Clearance for Proposed Sewage Treatment Plant (STP) on land bearing survey… — recommended by coastal authority, 4.1 km away
- Transfer of Environmental Clearance from M/s. Solvay Specialties India Private… — environmental approval granted, 7 km away
- Application for Amendment in Consent to Operate With Change in Product Mix in… — initial checks, 7.2 km away
- Application for Amendment in Consent to Operate with change in product mix in… — initial checks, 7.2 km away
- Application for Amendment in Consent to Operate With Change in Product Mix in… — initial checks, 7.2 km away
- Expansion of Synthetic Organic Chemicals & Agrochemicals manufacturing unit — lapsed, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.