Quick answers
What is this project?
Environmental Clearance for proposed 1x250 MW Thermal Power Project by M/s. Aparna Infra Energy India Private Limited is a proposed power project in Kawathala, Chimur, Chandrapur, Maharashtra. The site covers 172.5 acres.
Who is building it?
The applicant is Sufalam Metals Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kawathala, Chimur, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹111.7 crore and a site of 172.5 acres.
When was it filed?
The application was filed on 24 Jul 2026.
Project details
| Official title | Environmental Clearance for proposed 1x250 MW Thermal Power Project at Village Kawthala, Taluka-Chimur, Dist. Chandrapur by M/s. Aparna Infra Energy India Private Limited |
|---|---|
| Status | Returned to applicant |
| Status since | 11 Aug 2026 |
| Application filed | 24 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Power |
| Applicant | Sufalam Metals Limited |
| Land area | 172.5 acres (69.8 ha) |
| Project cost | ₹111.7 crore |
| Village / locality | Kawathala |
| Taluk / tehsil | Chimur |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13380 |
In context
10 applications in Chandrapur since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. At 172.5 acres, this one is smaller than 70% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kawathala, Chimur, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.40 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 3.7 km away
- Diversion of 0.4 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 3.9 km away
- Diversion of 0.7 ha. of Forest Land for Construction of a Sewage Treatment… — initial checks, 4.4 km away
- Diversion of 0.95 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 4.5 km away
- Diversion of 0.40 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 5.3 km away
- Diversion of 0.15 ha. of Forest Land for Construction of pumping station for a… — under forest review, 5.7 km away
- Diversion of 0.43 ha. of Forest Land for Construction of a Sewage Treatment… — under forest review, 8.4 km away
- Revalidation of prior EC of Kag Sand Ghat, Area 1.20 ha, Gut. no. 83, 84, 85,… — environmental approval granted, 8.7 km away
More from Sufalam Metals Limited in Chandrapur
- Proposed 0.9 MTPA Integrated Steel Plant (130 MW CPP, 0.9 MTPA DRI Plant… — under environmental review
- Proposed 0.9 MTPA Integrated Steel Plant (130 MW CPP, 0.9 MTPA DRI Plant… — not approved
3 Sufalam Metals projects in Chandrapur
All 5 Sufalam Metals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.