Quick answers
What is this project?
Environmental Clearance for Basalt Stone Mining Project (Area 1.10 Ha.) at Gat No. 139/1,139/2,139/3 (P), Haladgaon Village, Umred Taluka, Nagpur District, Maharashtra by M/s. Dristti Structural Engineering Pvt. Ltd. through Sunil Ramlal Wadhawan is a proposed mining project in Haladgaon, Umred, Nagpur, Maharashtra. The site covers 2.7 acres.
Who is building it?
The applicant is Dristti Structural Engineering Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Haladgaon, Umred, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹99 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 23 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 23 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dristti Structural Engineering Private Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Haladgaon |
| Taluk / tehsil | Umred |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13643 |
In context
318 applications in Nagpur since January 2022 are in the same category (Mining): 266 approved, 28 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 96% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 25.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 39 mining leases have applied within 5 km.
Where it is
Haladgaon, Umred, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Basalt Stone Mining Project (Area 1.80 Ha.) at Gat… — initial checks, 150 m away
- Haladgaon Stone Quarry, Kh.No.- 114, Area- 7.50 Ha, Village- Haladgaon, Ta.… — environmental approval granted, 250 m away
- Haladgaon Stone Quarry, Kh.No.- 114, Area- 7.50 Ha, Village- Haladgaon, Ta.… — cleared for impact study, 250 m away
- Haladgaon Stone Quarry, Kh No. 102 Part, 104, 105, 106/2, 107, 108, 111,… — environmental approval granted, 500 m away
- Parsodi Stone Quarry, Kh. No. 130/1 & 130/2, Area- 2.48 Ha, Village- Parsodi,… — cleared for impact study, 600 m away
- Parsodi Stone Quarry, Kh. No. 130/1 & 130/2, Area- 2.48 Ha, Village- Parsodi,… — environmental approval granted, 600 m away
- Parsodi Stone Quarry, Kh. No. 126(Part), Area- 3.70 Ha, Village- Parsodi, Ta.… — environmental approval granted, 600 m away
- Parsodi Stone Quarry, Kh. No. 126(Part), Area- 3.70 Ha, Village- Parsodi, Ta.… — cleared for impact study, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.