One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Expansion of Sugar Plant (6,000 to 10,000 TCD), Molasses-Based…
Project details
| Official title | Proposed Integrated Expansion of Sugar Plant (6,000 to 10,000 TCD), Molasses-Based Distillery (200 to 300 KLPD for Sugarcane Season) with 100 KLPD Grain-Based Off-Season Operation, and Cogeneration Plant (13 to 23 MW) at Village Shreenathnagar, Patethan, Post-Rahu, Tehsil Daund, District Pune, Maharashtra by Shreenath Mhaskoba Sakhar Karkhana Ltd |
|---|---|
| Status | Lapsed |
| Status since | 20 Aug 2026 |
| Application filed | 7 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shreenath Mhaskoba Sakhar Karkhana LTD |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹330.7 crore |
| Village / locality | Patethan |
| Taluk / tehsil | Daund |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13653 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Jul 2026 (this page) | Lapsed | 40 acres | ₹330.7 crore |
| Expansion filed 21 Feb 2026 | Returned to applicant | 40 acres | ₹330.7 crore |
In context
121 applications in Pune since January 2022 are in the same category (Industry): 81 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40 acres, this one is larger than 79% of them.
Where it is
Patethan, Daund, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Expansion of Sugar Plant (6,000 to 10,000 TCD),… — returned to applicant, 0 m away
- Proposed 60 KLPD Grain Based Distillery (for fuel ethanol) by Bhumiputra Green… — environmental approval granted, 7.3 km away
- Development/Widening of Talegaon Chakan Shikrapur-Nhavara Section of NH-548D… — in-principle approval, conditions pending, 7.9 km away
- Diversion of Forest Land proposed for improvement to SH-118 to Khutbav… — lapsed, 8.5 km away
- Environmental Clearance for Industrial Shed and Building by M/S. Sosyo Hajoori… — environmental approval granted, 10.5 km away
- Diversion of Reserved Forest area for Construction of Major Bridge on Theur… — under forest review, 10.8 km away
- Diversion of 0.061Ha. Reserved Forest land from G. No.70 of village… — lapsed, 11.5 km away
- Diversion of 0.1830 Ha. Reserved Forest land from G. No.70 of village… — in-principle approval, conditions pending, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.