Quick answers
What is this project?
Environmental Clearance for proposed Residential and commercial project "EVARA" located at S. No 508/1, 2, 3/509, 1,2/511,1,2, 510/1, 2, 3/511, 2, 512/, PLOT NO1+A1, A2, A3, A4, Kasbe Solapur–1, Solapur by M/s. Gayatri Developers is an approved mixed-use project in Kasbe Solapur, Solapur North, Solapur, Maharashtra. The site covers 2.3 acres.
Who is building it?
The applicant is Gayatri Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 May 2026), as of 27 Nov 2026.
Where is it?
In Kasbe Solapur, Solapur North, Solapur, Maharashtra.
How big is it?
It has a stated cost of ₹124.4 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 17 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 May 2026 |
| Application filed | 17 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gayatri Developers |
| Use | Mixed use |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹124.4 crore |
| Village / locality | Kasbe Solapur |
| Taluk / tehsil | Solapur North |
| District | Solapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13932 |
What the filings say
What is planned
Gayatri Developers proposes to construct a residential and commercial project named "EVARA" in Solapur. According to the project report, the development will consist of 374 residential flats and 52 commercial shops.
The project features two main towers, Tower 1 and Tower 2, both configured as Lower Ground Floor (LGP) + Upper Ground Floor (UGP) + 17 floors. The buildings reach a height of 53.05 metres from the ground level, or 59.42 metres including the lightning arrester. A club house is planned at the first-floor level.
Layout and design
The master layout plan indicates a central podium amenity and landscape space. Internal roads of 6.00 metres width surround the central area, providing a fire tender way with 9.00-metre turning radii at corners.
Specific areas are designated for environmental infrastructure, including a Sewage Treatment Plant (STP), an Organic Waste Converter (OWC), and a waste segregation area. The plan includes dedicated storage for dry waste, wet waste, e-waste, and bio-medical waste. Refuse areas are located on the 8th and 13th floors of the towers.
Water, power and access
The applicant estimates a water requirement of 4.5 kilolitres per day (KLD) for the labour camp during the construction phase, to be supplied by private tankers. For the operational phase, the project will use low-flow and low-flush plumbing fixtures and automatic level controllers to optimize water use.
Power backup will be provided by Diesel Generator (DG) sets. Energy-saving measures include the installation of Solar Photo-Voltaic (PV) panels for common area lighting and hot water supply. The design incorporates high-performance building materials with low thermal conductance (U-value) and external shading through staggered balconies to reduce heat gain.
Environmental safeguards
The project includes several environmental management systems:
- Sewage Treatment: An on-site STP using Moving Bed Biofilm Reactor (MBBR) technology will treat liquid waste. Treated water will be reused for flushing and landscape irrigation.
- Solid Waste: 100% of wet waste will be treated on-site using an Organic Waste Converter. Separate bins will be provided for dry, wet, e-waste, and battery waste.
- Rainwater Harvesting: The plan incorporates recharge pits and storm water management with oil and water separation facilities.
- Green Belt: A thick tree plantation is proposed along the site periphery to act as a buffer and reduce the heat island effect.
- Construction Management: Mitigation measures include site barricading with GI sheets, water sprinkling for dust suppression, and the use of Ready Mix Concrete (RMC) to minimize wastage.
| Item | Detail |
|---|---|
| Residential Units | 374 flats |
| Commercial Units | 52 shops |
| Building Configuration | LGP + UGP + 17 Floors |
| Maximum Height | 59.42 m (with lightning arrester) |
| Domestic Tank Capacity | 253 KLD |
| Fire Tank Capacity | 150 KLD |
| Labour Toilets | 10 (1 per 10 workers) |
| Construction Monitoring Cost | ₹7,12,800 |
| Operation Monitoring Cost | ₹3,11,200 |
Gayatri Developers Environmental Clearance for Proposed Residential and Commercial Project "EVARA" Located site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
19 applications in Solapur since January 2022 are in the same category (Buildings & townships): 12 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.3 acres, this one is smaller than 58% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasbe Solapur, Solapur North, Solapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Proposed Residential & Commercial development project… — cleared for impact study, 2.1 km away
- Environment clearance for Construction of Type-II (280 Qtrs.) & Type-III (28… — environmental approval granted, 4.7 km away
- Construction of Vanbhavan at gut no 26/4 of village Nharunagar Tal North… — lapsed, 4.9 km away
- Vanbhavan at gut no 138 pt of village Majarewadi Tal North Solapur Dist Solapur — lapsed, 5.3 km away
- Vanbhavan at gut no 138 pt of village Majarewadi Tal North Solapur Dist Solapur — lapsed, 5.3 km away
- Proposed Project "Kimaya Swapnasrushti " at Solapur by M/s Kimaya… — environmental approval granted, 6 km away
- Proposed project "Kimaya Swapnashrushti" at Solapur by M/s Kimaya… — withdrawn, 6 km away
- Expansion of Proposed Residential & Commercial Development Project at Sr. No.… — environmental approval granted, 6.3 km away
All 3 Gayatri Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.